Departamento de Engenharia de Sistemas
- 1.
- C.Lyra Filho e L.R.M.Ferreira,
``A Multiobjective Approach to the Short-Term Scheduling of A Hydroelectric Power Systems (este artigo, publicado em 11/95, não constou do SIPEX de 1995)'',
IEEE Transactions on Power Systems,
10(4), 1750-1755,
(1996).
- 2.
- S.Soares Filho e G.Cruz Jr,
``Non-Uniform Composite Representation of Hydroelectric Systems for Long-Term Hydrothermal Scheduling'',
IEEE Transactions on Power Systems,
11(2), 702-707,
(1996).
- 3.
- A.Said e W.A.Pearlman,
``A New fast and Efficient Image Codec Based on Set Partitioning Hierarchical Substrees'',
IEEE Transaction on Circuits and System for Video Technology,
6(3), 243-250,
(1996).
- 4.
- C.Lyra Filho, R.Castro e L.R.M.Ferreira,
``Assessing Decisions on Multiple Uses of Water and Hydroelectric'',
International Transactions in Operational Research,
3(2), 1-21,
(1996).
- 5.
- P.M.Franca, M.C.da Silva e P.D.B.Silveira,
``Long-Range Planning of Power Distribuition Systems: Secondary Networks'',
Computers and Electrical Engineering,
22(3), 179-191,
(1996).
- 6.
- P.M.Franca, G.Laporte, M.Gendreau e F.M.Muller,
``A Tabu Search Heuristic For The Multiprocessor Scheduling Problem With Sequence Dependent Setup Times'',
International Journal of Production Economics,
43, 79-89,
(1996).
- 7.
- R.Palazzo Jr e A.Said,
``New Ternary and Quaternary Linear Block Codes'',
IEEE Transactions on Information Theory,
IT42, 1356-1360,
(1996).
3/2/1998