Departamento de Engenharia de Sistemas

Trab. Comp. em Anais de Congr. Inter.

  1. Paulo M. Franca, Alexandre Sousa Mendes e Pablo Moscato, "Memetic Algorithms toMinimize Tardiness on a Single Machine with Sequence-Dependent Setup Times", 5th International Confernce of the Decision Sciences Institute, 4 , 1708-1710, Grecia, (1999). [91268]
  2. Alexandre Sousa Mendes, Felipe Martins Muller, Paulo M. Franca e Pablo Moscato, "Comparing Meta-heuristics Approaches for Parallel Machine Scheduling Problems with Sequence-Dependent Setup Times", ISPE/IEE Intern.Conf.on CAD/CAM, Robotics and Fatories of the Future, 1 , 1-6, Brasil, (1999). [91269]
  3. Claudio Motta Toledo, L.M. Aguilera e Paulo M. Franca, "An Approach to Solve the Dynamic Parallel Machine Schedulling Problem with Sequence-Dependent Changeover Costs", ISPE/IEE Int.Conf. on CAD/CAM, Robotics and Factories of the Future, 1 , 14-21, Brasil, (1999). [91270]
  4. Rosangela Ballini, Secundino Soares Filho e Marinho G. Andrade Filho, "Comparison of Seasonal Stramflow Forecasting Models", ISAP'99-Intern. Conference on Systems Applications to Power Systems, 1 , 20-25, Brasil, (1999). [91923]
  5. Rosangela Ballini, Secundino Soares Filho e Marinho G. Andrade Filho, "A Comparison of Neural Fuzzy Network and Bayesian Models to Seasonal Streamflow Series Forecasting", Int. ICSC Congress on Computational Intelligence Methods and Applicat, 1 , 74-80, Estados Unidos, (1999). [91931]
  6. Rosangela Ballini, Secundino Soares Filho e Marinho G. Andrade Filho, "Seasonal Streamflow Forecasting via a Fuzzy Neural System", 14th World Congress of IFAC Int. Federation of Automatic Control, K , 81-86, China, (1999). [91935]
  7. Celso Cavelucci e Christiano Lyra Filho, "Parallel Intelligent Search for Loss Minimization in Distribution Systems", 1999 IEEE Transmission and distribution Conference, 1 , 218-222, Estados Unidos, (1999). [92665]
  8. Cintia Rigão Scrich e Vinícius Amaral Armentano, "Tabu Search for the Flexible Job Shop with Due Dates", Third Metaheuristics International Conference, 1 , 437-441, Brasil, (1999). [92688]
  9. M.G. Santos, Marcos N. Arenales, R.E. Berretta e Vinícius Amaral Armentano, "A Heuristic for Lot-Sizing Multistage Systems with Parallel Machines", 15th Intern.Conf.on CAD/CAM,Robotics, and Factories of the Future, 1 , 219-224, Brasil, (1999). [92692]
  10. F.M.B. de Toledo e Vinícius Amaral Armentano, "A Heuristic for Capacitated Lot-Sizing in Parallel Machines", 15th Int.Conf. on CAD/CAM, Robotics and Factories of the Future, 1 , 225-229, Brasil, (1999). [92695]
  11. Marcos Trevisan Vasconcellos, R.J. Vanderbei e Anesio Dos Santos Jr., "New Optimal Power Flow Teaching Using LOQO Interior Point Solver and AMPL Modeling", International Conference on Engineering and Computer Education, 1 , 368-372, Brasil, (1999). [93164]