Faculty of Electrical and Computer Engineering
Projects with financing
1.
|
|
Walmir de Freitas Filho (Responsible). "THE NEW GENERATION OF ELECTRICAL POWER DISTRIBUTION SYSTEMS WITH EQUIPMENT BASED ON POWER ELECTRONICS AND DISPERSE GENERATION". Process #2001/05938-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2003), value: R$ 45.760,00.
|
2.
|
|
Milton Evangelista de Oliveira Filho (Responsible). "DRIVING THREE-PHASE INDUCTION MOTORS WITH MATRIX CONVERTER". Process #2001/04326-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-06/2005), value: R$ 105.144,00.
|
3.
|
|
ERNESTO RUPPERT FILHO (Responsible). "DRIVING THREE-PHASE INDUCTION MOTORS WITH MATRIX CONVERTER". Process #2001/04328-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2004), value: R$ 83.889,01. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
4.
|
|
FABIO VIOLARO (Responsible). "SPEAKER ADAPTATION IN SPEECH RECOGNITION SYSTEMS". Process #2002/05206-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the COMMUNICATIONS DEPARTMENT.
|
5.
|
|
ROBERTO DE ALENCAR LOTUFO (Responsible). "ADESSOWEB - DISTRIBUTED ENVIRONMENT FOR DEVELOPING SOFTWARE FOR IMAGE PROCESSING". Process #2001/10649-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 105.676,20. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
|
6.
|
|
Mario Ernesto de Souza e Silva (Responsible). "SEMIOTICAL AGENTS". Process #1999/03351-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1999-06/2003), value: R$ 105.144,00. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
|
7.
|
|
Mauricio Carvalho de Oliveira (Responsible). "NON-COMMUTATIVE SYMBOLIC ALGEBRA AND STABILITY ANALYSIS WITH MULTIPLIERS". Process #2001/14197-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-07/2002), value: R$ 22.799,70.
|
8.
|
|
Mauricio Carvalho de Oliveira (Responsible). "NON-COMMUTATIVE SYMBOLIC ALGEBRA AND STABILITY ANALYSIS WITH MULTUPLIERS". Process #2001/10104-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-12/2004), value: R$ 39.000,00.
|
9.
|
|
DALTON SOARES ARANTES (Responsible). "CORE STATELESS SCHEDULING ALGORITHMS FOR QUALITY OF SERVICE ORIENTED IP NETWORKS". Process #2001/14379-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2005), value: R$ 77.532,00. Project linked to the COMMUNICATIONS DEPARTMENT.
|
10
|
|
Alexandre de Sousa Mendes (Responsible), PAULO MORELATO FRANCA (Responsible). "MEMETIC ALGORITHMS AND THEIR APPLICATIONS TO PRODUCTION PROGRAMMING PROBLEMS". Process #1999/03136-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1999-08/2003), value: R$ 105.144,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
|
11
|
|
Cristiano de Mello Gallep (Responsible). "DYNAMIC CURRENT SUPPLY IN SEMICONDUCTOR OPTICAL AMPLIFIERS FOR SWITCHING IN OPTICAL NETWORKS". Process #1999/03886-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1999-08/2003), value: R$ 105.144,00. Project linked to the MICROWAVE AND OPTICS DEPARTMENT.
|
12
|
|
Flavio de Melo Pereira (Responsible). "ANALYSIS OF GENERALIZED PROCESSOR SHARING SERVICE DISCIPLINE UNDER SELF-SIMILAR TRAFFIC". Process #2000/00069-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2000-01/2002), value: R$ 27.932,20.
|
13
|
|
ALDARIO CHRESTANI BORDONALLI (Responsible). "ANALYSIS OF THE USE OF OPTICAL INJECTION LOCKING IN SIGNAL PROCESSING IN WDM SYSTEMS". Process #2001/12180-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 26.400,00. Project linked to the MICROWAVE AND OPTICS DEPARTMENT.
|
14
|
|
Adriana F�varo Domingues (Responsible). "ANALYSIS OF INTERAREA LOW FREQUENCY ELECTROMECHANICAL OSCILLATIONS IN ELECTRICAL POWER SYSTEMS". Process #2001/07662-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-07/2004), value: R$ 75.231,00.
|
15
|
|
CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "VOLTAGE STABILITY ANALYSIS OF ELECTRICAL POWER DISTRIBUTION SYSTEM CONTAINING DISTRIBUTED GENERATION". Process #2002/04380-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2002-07/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
16
|
|
Vitaly F�lix Rodriguez Esquerre (Responsible). "ANALYSIS OF OPTICAL GUIDES BY FINITE ELEMENTS IN THE TIME DOMAIN". Process #1998/16202-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1999-03/2003), value: R$ 105.144,00.
|
17
|
|
Ana Carolina Garcia Canas (Responsible). "APPLICATION OF FUZZY LOGIC IN THE ANALYSIS OF ELECTRICAL POWER NETWORKS". Process #2001/00819-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2003), value: R$ 28.728,00.
|
18
|
|
CARLOS ALBERTO FAVARIN MURARI (Responsible). "APPLICATION OF FUZZY LOGIC IN CONTIGENCY SELECTION". Process #2002/06512-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
19
|
|
EDSON BIM (Responsible). "APPLICATION OF STATUS OBSERVERS IN THE DIGITAL CONTROL OF PERMANENT MAGNET SYNCHRONOUS MOTOR". Process #2000/14316-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2003), value: R$ 39.533,51. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
20
|
|
Romis Ribeiro de Faissol Attux (Responsible). "APPLICATION OF EVOLUTIONARY TECHNIQUES, "FUZZY" LOGIC AND NON-LINEAR STRUCTURES TO THE EQUALIZATION AND IDENTIFICATION OF COMMUNICATION CHANNELS". Process #2001/00680-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-04/2005), value: R$ 105.144,00.
|
21
|
|
JOAO BATISTA DESTRO FILHO (Responsible). "SELF-TEACHING LEARNING: ANALYSIS AND APPLICATION IN TELECOMMUNICATIONS". Process #2002/01360-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-12/2002), value: R$ 20.020,00. Project linked to the COMMUNICATIONS DEPARTMENT.
|
22
|
|
Ricardo Jos� Gabrielli Barreto Campello (Responsible). "ARCHITECTURES, METHODS AND ALGORITHMS FOR MODELING AND CONTROL OF COMPLEX SYSTEMS USING COMPUTATIONAL INTELLIGENCE TECHNIQUES". Process #1999/03902-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/1999-08/2002), value: R$ 84.435,00.
|
23
|
|
Carolina de Mattos Affonso (Responsible). "FULFILLING MINIMUM REQUIREMENTS FOR VOLTAGE STABILITY MARGINS IN PROGRAMMING THE OPERATION OF ELECTRIC POWER SYSTEMS". Process #2000/11875-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-08/2004), value: R$ 91.338,00.
|
24
|
|
MIGUEL GUSTAVO LIZARRAGA ESPINOSA (Responsible). "PERSONAL AUTHENTICATION THROUGH BIOMETRIC CHARACTERISTICS WITH APPLICATIONS IN COMPUTER NETWORK SECURITY". Process #2002/04763-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2002-07/2003), value: R$ 34.320,00.
|
25
|
|
Pedro Henrique Librelon de Faria (Responsible). "AUTOMATIZATION OF AN ELECTRICAL CHARACTERIZATION SYSTEM OF FIELD EMISSION TIPS IN HIGH VACUUM". Process #2002/02373-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
|
26
|
|
Rangel Arthur (Responsible). "OBJECTIVE ASSESSMENT OF VIDEO CODECS". Process #1999/11334-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 31.179,63.
|
27
|
|
Alexandre Gon�alves Silva (Responsible). "IMAGE PROCESSING TOOLBOX FOR "NUMERICAL PHYTON"". Process #2000/13671-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (02/2001-01/2003), value: R$ 28.545,22.
|
28
|
|
Lia Toledo Moreira Mota (Responsible). "LOAD BEHAVIOR IN THE RECOMPOSITION OF ELECTRICAL POWER SYSTEMS". Process #2000/11164-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2005), value: R$ 105.144,00.
|
29
|
|
Alexandra Maria Rodrigues Cardoso (Responsible). "IMAGE COMPRESSION AND INTERPOLATION USING FRACTAL". Process #1998/16209-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-02/2003), value: R$ 105.144,00.
|
30
|
|
Gentil Silveira Soares (Responsible). "CONTRACTILE IMPAIRMENT OF HEART TISSUE AFTER STIMULATION BY HIGH INTENSITY ELECTRIC FIELD". Process #2000/07710-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-06/2002), value: R$ 25.329,00.
|
31
|
|
"CONSTRUCTION AND PERFORMANCE ANALYSIS OF SIGNAL CONSTELLATIONS ON MINIMAL SURFACES". Process #2000/04203-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-05/2002), value: R$ 25.910,41.
|
32
|
|
VERA LUCIA DA SILVEIRA NANTES BUTTON (Responsible). "CONSTRUCTION AND CHARACTERIZATION OF EWO AND PWO NON-DIFFRACTIVE ULTRASONIC TRANSLATORS". Process #2001/13161-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
|
33
|
|
"CONTRIBUTION TO THE SOLUTION OF OPTIMIZATION PROBLEMS THROUGH NEURAL NETWORKS". Process #1998/16562-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1999-09/2002), value: R$ 93.008,13.
|
34
|
|
Marcia Tomie Takahashi (Responsible). "CONTRIBUTIONS TO THE STUDY OF FUZZY GRAPHS: THEORY, ALGORITHMS AND APPLICATIONS". Process #2000/10065-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2000-03/2004), value: R$ 89.037,00.
|
35
|
|
Fernando Pinhabel Marafão (Responsible). "CONTROL OF ELECTRICAL POWER QUALITY THROUGH DIGITAL SIGNAL PROCESSING TECHNIQUES". Process #1999/11882-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2004), value: R$ 40.994,54.
|
36
|
|
Eduardo Fontoura Costa (Responsible). "CONTROL OF LINEAR SYSTEMS SUBJECT TO MARKOVIAN JUMPS". Process #1998/13095-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-02/2002), value: R$ 72.244,64.
|
37
|
|
Eduardo Fontoura Costa (Responsible). "CONTROL AND FILTERING OF LINEAR SYSTEMS SUBJECT TO MARKOVIAN JUMPS". Process #2001/12233-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 34.320,00.
|
38
|
|
SIGMAR MAURER DECKMANN (Responsible). "Development of Methodology for Measurement and Treatment of Electrical Quantities for Recording and Management of Power Conformity". Companhia Paulista de For�ae Luz, (04/2002-04/2003), value: R$ 21.100,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
39
|
|
Alexandre de Andrade (Responsible). "COMBINED CHANNEL AND SOURCE DECODING". Process #2001/07955-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2001-09/2004), value: R$ 77.532,00.
|
40
|
|
HUGO ENRIQUE HERNANDEZ FIGUEROA (Responsible). "DEVELOPMENT OF MULTIPlatform GUI AND WEB COMPUTATION ENVIRONMENTS FOR VECTOR SIMULATOR OF PHOTONIC GUIDES BASED ON FINITE ELEMENTS". Process #2002/09939-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2002-11/2003), value: R$ 3.960,00. Project linked to the MICROWAVE AND OPTICS DEPARTMENT.
|
41
|
|
Diego Rodrigues Thuler (Responsible). "DEVELOPMENT OF A SIGNAL PROCESSING CIRCUIT OF AN ULTRASONIC BLOOD FLOW METER FOR AN EXTRACORPOREAL CIRCULATION SYSTEM". Process #2001/00449-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-05/2003), value: R$ 3.960,00.
|
42
|
|
Marcos de Araujo Paz (Responsible). "DEVELOPMENT OF TRANSMISSION LINES MODELS FOR ELECTROMAGNETIC TRANSIENT SIMULATION PROGRAMS". Process #2001/09259-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 49.920,00.
|
43
|
|
MARIA CRISTINA DIAS TAVARES (Responsible). "DEVELOPMENT OF MODELS IN ELECTROMAGNETIC TRANSIENT PROGRAMS". Process #1998/14826-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1999-03/2003), value: R$ 119.977,29. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
44
|
|
Keops Roger Michelotto Koto (Responsible). "DEVELOPMENT OF AN INTEGRATED OPTICAL SENSOR FOR BLOOD GLUCOSE CONCENTRATION". Process #1999/11349-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2002), value: R$ 31.200,00.
|
45
|
|
ANTONIO AUGUSTO FASOLO QUEVEDO (Responsible). "DEVELOPMENT OF A LOW-COST SURFACE ELECTROMYOGRAPH INTERCONNECTABLE TO A PC: ACQUISITION AND ANALOG TREATMENT, CONVERSION TO/CODING". Process #2002/03434-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
|
46
|
|
ANTONIO AUGUSTO FASOLO QUEVEDO (Responsible). "DEVELOPMENT OF A LOW-COST SURFACE ELECTROMYOGRAPH INTERCONNECTABLE TO A PC: TRANSMISSION, DECODING AND COMMUNICATION WITH TERMINAL". Process #2002/03435-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2002-06/2003), value: R$ 1.980,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
|
47
|
|
MARCONI KOLM MADRID (Responsible). "DEVELOPMENT OF A HARDWARE SYSTEM FOR TRACKING CONTINUOUS TRAJECTORIES OF INDUSTRIAL ROBOTS BASED ON HEURISTIC SEARCH AND ARTIFICIAL VISION". Process #2002/05046-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-04/2005), value: R$ 68.328,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
48
|
|
Marcel Abrantes (Responsible). "DEVELOPMENT OF AN ITERFACE BETWEEN MTK AND SPACEBALL". Process #2002/01161-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
|
49
|
|
CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "DETERMINATION OF CRITICAL BAR AND TENSION COLLAPSE POINT USING THE TANGENT VECTOR". Process #2002/05987-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
50
|
|
JOSE WILSON MAGALHAES BASSANI (Responsible). "DETERMINATION OF THE LETHAL ELECTRIC FIELD FOR ISOLATED HEART CELLS". Process #2000/03833-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-06/2002), value: R$ 7.920,00.
|
51
|
|
MICHEL DAOUD YACOUB (Responsible). "RICE DISTRIBUTION AND ANALYTICAL APPROACHES TO ITS AVERAGE". Process #2002/03318-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 3.960,00. Project linked to the COMMUNICATIONS DEPARTMENT.
|
52
|
|
Michel Zamboni Rached (Responsible). "EFFECTS OF POLARIZATION AND NON-LINEARITIES IN WDM OPTICAL SYSTEMS". Process #2000/09386-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2004), value: R$ 105.144,00.
|
53
|
|
"STABILITY AND CONTROL OF LINEAR SYSTEMS WITH NON-LINEAR ELEMENTS". Process #2000/12632-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2005), value: R$ 105.144,00.
|
54
|
|
Eduardo Nobuhiro Asada (Responsible). "GENERALIZED STATE ESTIMATION IN ELECTRIC POWER SYSTEMS DETERMINATION OF STATES AND PARAMETERS". Process #1999/11426-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-03/2004), value: R$ 100.542,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
55
|
|
CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "QUICK ESTIMATION OF THE MAXIMUM LOADING POINT FOR VOLTAGE STABILITY ANALYSIS OF BRIDGE ELECTRICAL SYSTEMS". Process #2001/13024-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-08/2004), value: R$ 63.726,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
56
|
|
Jos� Renato de Paula Naves (Responsible). "EVOLUTIONARY STRATEGIES FOR OPTICAL NETWORKING FROM WDM RINGS". Process #2000/04262-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2002), value: R$ 27.182,68.
|
57
|
|
ROSANGELA BALLINI (Responsible). "STRUCTURE AND LEARNING OF DYNAMIC NEURAL NEURAL NETWORKS". Process #2000/06198-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-07/2002), value: R$ 61.013,30.
|
58
|
|
VERA LUCIA DA SILVEIRA NANTES BUTTON (Responsible). "STUDY OF THE PODIIZATION OF PIEZOELECTRIC CERAMICS TO REDUCE ACOUSTIC DIFFRACTION IN THE FIELD GENERATED BY ULTRASOUND TRANSDUCERS". Process #2000/12492-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-03/2003), value: R$ 38.274,78. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
|
59
|
|
IOSHIAKI DOI (Responsible). "STUDY OF THE SI-POLY LAYER FOR DOORS OF MOS STRUCTURES AND MICROSTRUCTURES". Process #1999/07617-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2000-06/2002), value: R$ 174.693,12. Project linked to the DEPT. OF MACHINE COMPONENTS AND INTELLIGENT SYSTEMS.
|
60
|
|
ARIOVALDO VERANDIO GARCIA (Responsible). "STUDY OF THE TRANSMISSION CAPACITY OF INTERCONNECTED SYSTEMS IN THE NEW MODEL OF ELECTRIC POWER SYSTEMS". Process #2001/13258-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-12/2002), value: R$ 1.980,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
61
|
|
Kl�ber Zuza Nobrega (Responsible). "STUDY OF THE INTERACTION OF VECTOR SPATIAL SOLITONS AND THEIR APPLICATIONS IN THE DESIGN OF PHOTONIC DEVICES". Process #2000/04593-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-04/2004), value: R$ 102.843,00.
|
62
|
|
"STUDY OF THE INTERACTIONS OF POLYCRYSTALLINE DIAMOND WITH BONE TISSUE AND ITS APPLICATIONS IN THE COATING OF ORTHOPEDIC PROSTHESES". Process #2000/08274-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2002), value: R$ 7.920,00.
|
63
|
|
Rodrigo Pereira Ramos (Responsible). "PERFORMANCE STUDY OF CDMA SYSTEMS IN TCP/IP NETWORKS". Process #2001/03213-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2001-05/2005), value: R$ 105.144,00.
|
64
|
|
"STUDY OF THE MANUFACTURE PROCESS OF POWER "SCHOTTKY" DIODE". Process #2000/14255-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2003), value: R$ 28.728,00.
|
65
|
|
Adriana Scheffer Quintela Ferreira (Responsible). "STUDY OF A PROXIMITY INDEX TO THE VOLTAGE STABILITY LIMIT AND ITS APPLICATION IN THE SELECTION OF CONTINGENCIES". Process #2000/07711-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-08/2002), value: R$ 26.972,63. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
66
|
|
Jorge Andr� Gir�o Albuquerque (Responsible). "STUDY AND CHARACTERIZATION OF ULTRASOUND IMAGES OBTAINED WITH CONTRAST AGENTS". Process #2001/00670-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-06/2005), value: R$ 105.144,00.
|
67
|
|
ERNESTO RUPPERT FILHO (Responsible). "STUDY AND CONSTRUCTION OF A THREE-PHASE ACTIVE FILTER FOR UNBALANCED FOUR-WIRE LOADS". Process #2002/05718-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
68
|
|
Gustavo Fraidenraich (Responsible). "STUDY ON THE EFFECTS OF INTERCHANNEL AND INTERPATH INTERFERENCES ON RECEIVERS OF WIDE-BAND CDMA SYSTEMS". Process #2000/07633-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-07/2002), value: R$ 25.887,30.
|
69
|
|
Eduardo Javier Huerta Yero (Responsible). "STUDY ON MASSIVELY PARALLEL PROCESSING ON THE INTERNET". Process #1998/04305-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1998-08/2002), value: R$ 105.076,61.
|
70
|
|
Daniel Tost (Responsible). "EXTENSION OF 3D CURSOR EMULATION FUNCTIONS IN MTK". Process #2002/01162-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
|
71
|
|
Lesnir Ferreira Porto (Responsible). "MANUFACTURING AND ELECTRICAL CHARACTERIZATION OF FIELD EMISSION TIPS IN HIGH VACUUM". Process #2002/02374-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
|
72
|
|
LUIZ CARLOS PEREIRA DA SILVA (Responsible). "TRANSMISSION LOSSES ALLOCATION FACTORS IN A COMPETITIVE ELECTRIC POWER MARKET: AN EQUITABLE DEFINITION BASED ON AC LOAD FLOW". Process #2002/05029-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2002-09/2005), value: R$ 77.532,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
73
|
|
Ricardo Grossi Dantas (Responsible). "COMPUTAL TOOLS FOR PROCESSING ULTRASONIC IMAGES OBTAINED BY "B" MODE". Process #2000/00402-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2000-04/2004), value: R$ 77.532,00.
|
74
|
|
EDMUNDO DA SILVA BRAGA (Responsible). "HYDROGENATED AMORPHOUS CARBON FILMS FOR ELECTRICAL AND OPTICAL APPLICATIONS". Process #1999/04871-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/1999-10/2002), value: R$ 124.920,05. Project linked to the DEPARTMENT OF ELECTRONICS AND MICROELECTRONICS.
|
75
|
|
CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "CONTINUATION LOAD FLOW: AUTOMATIC DETERMINATION OF THE CONTINUATION PARAMETER". Process #2001/10968-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2004), value: R$ 26.400,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
76
|
|
PAULO AUGUSTO VALENTE FERREIRA (Responsible). "DYNAMIC IDENTIFICATION AND LONGITUDINAL CONTROL OF AN AUTONOMOUS ROBOTIC AIRSHIP". Process #2001/12425-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 26.400,00. Project linked to the TELEMATICS DEPARTMENT.
|
77
|
|
EDUARDO TAVARES COSTA (Responsible). "IMPLEMENTATION OF PROGRAMS IN OPEN SYSTEMS FOR REMOTE ACCESS TO LUS/CEB MEASUREMENT EQUIPMENT". Process #2001/14211-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
|
78
|
|
SECONDINO SOARES FILHO (Responsible). "INFLUENCE OF SPATIAL CORRELATION ON THE FORECASTING OF INFLUENT FLOWS". Process #2001/13351-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2005), value: R$ 77.532,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
|
79
|
|
FERNANDO ANTONIO CAMPOS GOMIDE (Responsible). "COMPUTER INTELLIGENCE AND MULTI-AGENT SYSTEMS IN COMPUTING MARKET SYSTEMS AND MODELS: ANALYSIS, ALGORITHMS AND APPLICATIONS". Process #2001/13568-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2005), value: R$ 77.532,00. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
|
80
|
|
Edilson Fernandes de Arruda (Responsible). "SIMPLE POLICY INVESTIGATION IN INVESTMENT AND PRODUCTION PROBLEMS IN THE PRESENCE OF UNCERTAINTY". Process #2000/06524-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2002), value: R$ 20.834,06.
|
81
|
|
CARLOS RODRIGUES DE SOUZA (Responsible). "SURVEY OF EXPERIMENTAL DATA FOR MODELING A SECTOR ENGINE VIA ARTIFICIAL NEURAL NETWORKS". Process #2000/10715-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-02/2002), value: R$ 8.686,01. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
82
|
|
Francisco de Assis Zampirolli (Responsible), ROBERTO DE ALENCAR LOTUFO (Responsible). "PROGRAMMING LANGUAGE FOR ARCHITECTURE-INDEPENDENT MORPHOLOGICAL ALGORITHMS". Process #1998/06641-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/1998-01/2002), value: R$ 77.401,05. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
|
83
|
|
JACOBUS WILLIBRORDUS SWART (Responsible). "MAINTENANCE OF IONIUM IMPLEMENTATION SYSTEM FOR RESEARCH IN MICROELECTRONICS AND MATERIALS". Process #2000/08826-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2003), value: R$ 1.352.544,10. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
|
84
|
|
Jayme Garcia Arnal Barbedo (Responsible). "OBJECTIVE MEASURE FOR ASSESSING THE QUALITY OF AUDIO CODECS". Process #2001/04144-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2005), value: R$ 105.144,00.
|
85
|
|
Igor Kopcak (Responsible). "IMPROVEMENT OF VOLTAGE STABILITY MARGINS IN THE PROBLEM OF PRE-DISPATNESS OF THE OPERATION THROUGH MINIMUM LOAD SHUTTING". Process #2001/03639-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-03/2003), value: R$ 25.329,00.
|
86
|
|
Almir Laranjeira Neri Junior (Responsible). "ALTERNATIVE METHODS FOR DRIVING THE FRACTIONAL TWO-PHASE INDUCTION MOTOR: LOAD TESTS, IMPROVEMENTS IN THE DIMMER METHOD AND PATENT IABILITY ANALYSIS". Process #2001/04622-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-12/2002), value: R$ 5.610,00.
|
87
|
|
Anibal Tavares de Azevedo (Responsible). "INTERIOR POINT METHODS APPLIED TO GENERALIZED GRAPH PROBLEMS WITH ADDITIONAL CONSTRAINTS". Process #1999/12071-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2002), value: R$ 28.574,89.
|
88
|
|
Marco Antonio Robert Alves (Responsible). "VACUUM FIELD EMISSION MICRODEVICES". Process #2000/04585-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2003), value: R$ 223.227,00.
|
89
|
|
Marco Antonio Robert Alves (Responsible). "VACUUM FIELD EMISSION MICRODEVICES". Process #2000/08493-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2003), value: R$ 97.713,00.
|
90
|
|
Annabell del Real Tamariz (Responsible). "COMPUTATIONAL DATA MODELING AND INTELLIGENT CONTROL IN STATE SPACE". Process #1998/15357-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/1999-04/2003), value: R$ 106.739,50.
|
91
|
|
Leandro Tiago Man�ra (Responsible). "MODELING OF MOS STRUCTURES". Process #2000/05136-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2000-04/2002), value: R$ 27.183,00.
|
92
|
|
Sahudy Montenegro González (Responsible). "MODEL FOR MANAGING IMAGE DATABASES". Process #1999/04150-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1999-06/2003), value: R$ 105.144,00.
|
93
|
|
ANA CRISTINA CAVALCANTI LYRA (Responsible). "THE STUDY OF THE DOUBLE EXCITED MACHINE". Process #2001/13658-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 26.400,00. Project linked to the DEPT. OF MACHINE COMPONENTS AND INTELLIGENT SYSTEMS.
|
94
|
|
Karcius Day Ros�rio Assis (Responsible). "SUPPORT FOR INTERNET TRAFFIC THROUGH THE OPTICAL NETWORK". Process #2000/08863-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-09/2004), value: R$ 105.144,00.
|
95
|
|
Helder Jos� Ceragioli (Responsible). "OBTAINING POROUS DIAMOND FILTERS IN THE FORM OF MEMBRANES AND TUBES". Process #2000/14846-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-06/2003), value: R$ 68.640,00.
|
96
|
|
PAULO AUGUSTO VALENTE FERREIRA (Responsible). "GLOBAL MULTI-OBJECTIVE OPTIMIZATION". Process #2001/09257-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-04/2004), value: R$ 53.460,00. Project linked to the TELEMATICS DEPARTMENT.
|
97
|
|
Denise Sato Yamashita (Responsible), VINICIUS AMARAL ARMENTANO (Responsible). "ROBUST OPTIMIZATION APPLIED TO RESOURCE PLANNING AND PROGRAMMING OF PROJECT ACTIVITIES". Process #1999/06212-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1999-08/2003), value: R$ 105.144,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
|
98
|
|
PAULO MORELATO FRANCA (Responsible). "PLANNING OF THE SECONDARY ELECTRIC POWER DISTRIBUTION NETWORK". Process #2001/06773-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-07/2002), value: R$ 5.335,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
|
99
|
|
SECONDINO SOARES FILHO (Responsible). "PLANNING AND PROGRAMMING OF THE OPERATION OF ELECTRIC POWER SYSTEMS". Process #1999/12737-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2004), value: R$ 336.682,62. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
|
100
|
|
LUIZ CARLOS PEREIRA DA SILVA (Responsible). "PRE-DISCRIPTION OF THE OPERATION OF ELECTRICAL POWER SYSTEMS INCLUDING VOLTAGE STABILITY RESTRICTIONS". Process #2001/00164-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-07/2002), value: R$ 45.760,00.
|
101
|
|
ARIOVALDO VERANDIO GARCIA (Responsible). "WORKLOAD FORECASTING USING ARTIFICIAL NEURAL NETWORKS". Process #2002/00647-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2003), value: R$ 1.320,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
102
|
|
"JOINT PROBLEM OF BATCH SIZING AND PRODUCTION SCHEDULING". Process #2000/02609-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2004), value: R$ 105.144,00.
|
103
|
|
"PROCEDURES FOR HYBRID COMPRESSION METHOD IN DIGITAL VIDEO PROCESSING, APPLYING "WAVELET - (PDI)" TRANSFORM". Process #2000/11156-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2005), value: R$ 105.144,00.
|
104
|
|
Fernando Silvestre da Silva (Responsible). "PROCEDURES FOR IMAGE TREATMENT AND COMPRESSION USING FRACTAL TECHNOLOGY (PDI)". Process #2000/11157-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-04/2005), value: R$ 105.144,00.
|
105
|
|
JACOBUS WILLIBRORDUS SWART (Responsible). "SPECIAL PROGRAM FOR MANUFACTURE OF INTEGRATED CIRCUITS ABROAD PHASE 4". Process #2001/04989-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2003), value: R$ 1.335.844,20. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
|
106
|
|
Luciana Martinez (Responsible). "DUAL STOCHASTIC DYNAMIC PROGRAMMING APPLIED TO PLANNING THE ENERGY OPERATION OF HYDROELECTRICAL SYSTEMS". Process #2001/13412-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-06/2003), value: R$ 34.320,00.
|
107
|
|
Marcelo Gradella Villalva (Responsible). "DESIGN AND CONSTRUCTION OF A THREE-WIRE ACTIVE POWER FILTER". Process #2001/08948-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2001-06/2002), value: R$ 2.640,00.
|
108
|
|
Leonardo Breseghello Zoccal (Responsible). "DESIGN AND MANUFACTURE OF MONOLITHIC MICROWAVE INTEGRATED CIRCUIT (MMIC)". Process #1999/11351-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 31.199,99.
|
109
|
|
"DESIGN AND IMPLEMENTATION OF AN OPEN SOURCE COMPUTATIONAL PLATFORM TO AID THE TEACHING OF MICROELECTRONICS". Process #2000/09027-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2001-08/2002), value: R$ 24.196,00.
|
110
|
|
Marcos Augusto de Goes (Responsible). "INTEGRATED OPTICAL RECEIVER FOR HIGH CAPACITY COMMUNICATION SYSTEMS USING BIPOLAR HETEROJUNCTION TRANSISTORS". Process #1999/11350-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 31.200,00.
|
111
|
|
LUIS GERALDO PEDROSO MELONI (Responsible). "AUTOMATIC SPEECH RECOGNITION IN REAL TIME". Process #2002/05686-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the COMMUNICATIONS DEPARTMENT.
|
112
|
|
Mercedes Roc�o Gonzales M�rquez (Responsible). "RECONSTRUCTION OF A "3D" MODEL FROM MULTIPLE DEPTH IMAGES". Process #2000/10913-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-11/2004), value: R$ 105.144,00.
|
113
|
|
Taciana de Vasconcelos Menezes (Responsible). "REACTIVE REDISCRIPTION VIA MODAL PARTICIPATION FACTORS FOR IMPROVING VOLTAGE STABILITY MARGINS IN ELECTRIC POWER SYSTEMS". Process #2000/10221-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-09/2002), value: R$ 26.455,90.
|
114
|
|
PEDRO LUIS DIAS PERES (Responsible). "TECHNICAL RESERVE - FAPESP POSTGRADUATE SCHOLARSHIP IN THE COUNTRY - (97/13703-5)". Process #1998/02629-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1998-02/2002), value: R$ 4.587,00. Project linked to the TELEMATICS DEPARTMENT.
|
115
|
|
CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "SOLVING THE LOAD FLOW PROBLEM FOR DISTRIBUTION NETWORKS USING THE FAST DECOUPLED METHOD WITH OPTIMAL AXLE ROTATION". Process #2002/05986-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2002-07/2003), value: R$ 1.980,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
|
116
|
|
"HIGH QUALITY RECTIFIERS WITH LOW FREQUENCY SWITCHING". Process #1999/09400-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-05/2002), value: R$ 90.067,98.
|
117
|
|
Eduardo da Silva Martins (Responsible). "SINGLE-PHASE RECTIFIERS WITH HIGH POWER FACTOR AND LOW FREQUENCY SWITCHING". Process #2000/01670-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2002), value: R$ 31.200,00.
|
118
|
|
Joanna Helena Mantelli A. Gomes Marafão (Responsible). "THREE-PHASE RECTIFIERS WITH HIGH POWER FACTOR USING LOW FREQUENCY SWITCHING". Process #1999/12240-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 30.805,51.
|
119
|
|
Jonatas Fred Rossetto (Responsible). "DISTRIBUTED SENSOR USING NON-LINEAR EFFECTS IN OPTICAL FIBERS FOR APPLICATION IN INTELLIGENT STRUCTURES". Process #2000/09731-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-10/2004), value: R$ 93.639,00.
|
120
|
|
VITOR BARANAUSKAS (Responsible). "GAS SENSORS FROM POROUS TIN DIOXIDE THIN FILM". Process #2001/08700-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-07/2004), value: R$ 61.425,00. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
|
121
|
|
Mauricio Luis Bottoli (Responsible). "SIMULATION OF WDM OPTICAL NETWORKS". Process #1998/15467-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/1999-04/2003), value: R$ 105.144,00.
|
122
|
|
VERA LUCIA DA SILVEIRA NANTES BUTTON (Responsible). "SIMULATION OF THE ACOUSTIC FIELD GENERATED BY A NON-DIFFRACTIVE X-WAVE ULTRASONIC TRANSDUCER". Process #2001/13163-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
|
123
|
|
ERNESTO RUPPERT FILHO (Responsible). "SIMULATING THE BEHAVIOR OF A THREE-PHASE INVERTER AT THREE LEVELS FEEDING A THREE-PHASE INDUCTION MOTOR". Process #2002/01264-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 3.960,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
124
|
|
Hayram Nicício (Responsible). "SIMULATION AND MEASUREMENT OF THREE-DIMENSIONAL ULTRASONIC FIELDS FOR TRANSDUCER CHARACTERIZATION". Process #2000/00074-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-03/2002), value: R$ 27.165,55.
|
125
|
|
Leticia Santos da Rocha (Responsible). "ACTIVITY-BASED COSTING SYSTEM FOR MANAGING THE MAINTENANCE PROCESS OF MEDICAL CARE EQUIPMENT". Process #2001/05944-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-04/2005), value: R$ 98.241,00.
|
126
|
|
Ricardo Quadros Machado (Responsible), Ricardo Quadros Machado (Responsible). "HYBRID CO-GENERATION SYSTEM WITH ELECTRONIC POWER CONDITIONING AND DIGITAL CONTROL". Process #2000/11038-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2000-10/2004), value: R$ 41.093,90.
|
127
|
|
JOSE ANTENOR POMILIO (Responsible). "INTEGRATED ENERGY SYSTEM BASED ON FUEL CELLS FOR APPLICATION IN SMALL ELECTRICAL PLANTS". Process #2000/13784-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-12/2002), value: R$ 30.124,59. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
|
128
|
|
JOSE WILSON MAGALHAES BASSANI (Responsible). "Telecommunications and Applications for Telemedicine and Teleeducation". Financing of Studies and Projects, (12/2000-12/2002), value: US$ 990.948,25. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
|
129
|
|
Maurício Sol de Castro (Responsible). "SELF-TEACHING EQUALIZATION TECHNIQUES IN A MULTICHANNEL ENVIRONMENT". Process #2000/02206-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-04/2002), value: R$ 26.829,49.
|
130
|
|
Victor Kazuo Tatai (Responsible). "INTELLIGENT SYSTEMS TECHNIQUES APPLIED TO THE DEVELOPMENT OF COMPUTER GAMES". Process #2000/07631-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2002), value: R$ 28.692,00.
|
131
|
|
Davi Correia (Responsible). "META-HEURISTIC OPTIMIZATION TECHNIQUES IN THE SYNTHESIS OF OPTICAL WAVEGUIDES". Process #2000/04371-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-03/2002), value: R$ 28.251,85.
|
132
|
|
EDSON MOSCHIM (Responsible). "TESTS AND SPACE APPLICATIONS OF RADIATION SENSORS IN THE THZ BAND". Process #2002/04774-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-04/2004), value: R$ 21.868,00. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
|
133
|
|
LUIS GIMENO Y LATRE (Responsible). "Sequential Techniques for Supply Chain Planning". Coordination of the Improvement of Higher Education Personnel, (01/2002-), value: R$ 19.400,00. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
|
134
|
|
ALDARIO CHRESTANI BORDONALLI (Responsible). "TOPOLOGIES FOR OPTIMIZING THE PERFORMANCE OF DOPED FIBER OPTICAL AMPLIFIERS". Process #2001/09806-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-12/2003), value: R$ 175.408,19.
|
135
|
|
Mois�s Vidal Ribeiro (Responsible). "TRANSMISSION AND EQUALIZATION BY SUB-BANDS AND IMPULSIVE NOISE CONCELLATION FOR EFFICIENT USE OF PLC (POWERLINE COMMUNICATION) CHANNELS". Process #2001/08513-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2001-09/2004), value: R$ 77.532,00.
|
136
|
|
PAULO MORELATO FRANCA (Responsible). "AN ENVIRONMENT FOR RESOLVING MULTI-CRITERIA COMBINATORY OPTIMIZATION PROBLEMS OF ELECTRIC POWER DISTRIBUTION SYSTEMS". Process #2002/08800-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2002-03/2005), value: R$ 61.425,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
|
137
|
|
TAKAAKI OHISHI (Responsible). "A BUS LOAD PREDICTION MODEL". Process #2002/06733-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
|
138
|
|
"A BIOMETRIC PERSONAL IDENTIFICATION SYSTEM WITH BIO-CRYPTOGRAPHY CHARACTERISTICS IN LOCAL NETWORKS OR INTERNET". Process #2000/12641-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2005), value: R$ 105.144,00.
|
139
|
|
Marcelo Augusto Cicogna (Responsible). "AN OBJECT-ORIENTED COMPUTATION SYSTEM FOR COMPARING OPERATING POLICIES OF HYDROTHERMAL POWER SYSTEMS". Process #1998/16269-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-02/2003), value: R$ 105.144,00.
|
140
|
|
Wagner Luiz Alves de Oliveira (Responsible). "AN APPROACH TO MODELING DIGITAL SYSTEMS". Process #1999/04321-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2000-12/2003), value: R$ 105.144,00.
|
141
|
|
Sandra Kise Uehara (Responsible). "A METHODOLOGY FOR CALCULATING "SPOT PRICE" WITH SECURITY RESTRICTIONS". Process #2000/06345-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2002), value: R$ 19.371,29.
|
|
|
|