Faculty of Electrical and Computer Engineering
 
Projects with financing
 
1.
  Walmir de Freitas Filho (Responsible). "THE NEW GENERATION OF ELECTRICAL POWER DISTRIBUTION SYSTEMS WITH EQUIPMENT BASED ON POWER ELECTRONICS AND DISPERSE GENERATION". Process #2001/05938-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2003), value: R$ 45.760,00.
 
2.
  Milton Evangelista de Oliveira Filho (Responsible). "DRIVING THREE-PHASE INDUCTION MOTORS WITH MATRIX CONVERTER". Process #2001/04326-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-06/2005), value: R$ 105.144,00.
 
3.
  ERNESTO RUPPERT FILHO (Responsible). "DRIVING THREE-PHASE INDUCTION MOTORS WITH MATRIX CONVERTER". Process #2001/04328-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2004), value: R$ 83.889,01. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
4.
  FABIO VIOLARO (Responsible). "SPEAKER ADAPTATION IN SPEECH RECOGNITION SYSTEMS". Process #2002/05206-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the COMMUNICATIONS DEPARTMENT.
 
5.
  ROBERTO DE ALENCAR LOTUFO (Responsible). "ADESSOWEB - DISTRIBUTED ENVIRONMENT FOR DEVELOPING SOFTWARE FOR IMAGE PROCESSING". Process #2001/10649-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 105.676,20. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
 
6.
  Mario Ernesto de Souza e Silva (Responsible). "SEMIOTICAL AGENTS". Process #1999/03351-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1999-06/2003), value: R$ 105.144,00. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
 
7.
  Mauricio Carvalho de Oliveira (Responsible). "NON-COMMUTATIVE SYMBOLIC ALGEBRA AND STABILITY ANALYSIS WITH MULTIPLIERS". Process #2001/14197-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-07/2002), value: R$ 22.799,70.
 
8.
  Mauricio Carvalho de Oliveira (Responsible). "NON-COMMUTATIVE SYMBOLIC ALGEBRA AND STABILITY ANALYSIS WITH MULTUPLIERS". Process #2001/10104-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-12/2004), value: R$ 39.000,00.
 
9.
  DALTON SOARES ARANTES (Responsible). "CORE STATELESS SCHEDULING ALGORITHMS FOR QUALITY OF SERVICE ORIENTED IP NETWORKS". Process #2001/14379-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2005), value: R$ 77.532,00. Project linked to the COMMUNICATIONS DEPARTMENT.
 
10
  Alexandre de Sousa Mendes (Responsible), PAULO MORELATO FRANCA (Responsible). "MEMETIC ALGORITHMS AND THEIR APPLICATIONS TO PRODUCTION PROGRAMMING PROBLEMS". Process #1999/03136-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1999-08/2003), value: R$ 105.144,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
 
11
  Cristiano de Mello Gallep (Responsible). "DYNAMIC CURRENT SUPPLY IN SEMICONDUCTOR OPTICAL AMPLIFIERS FOR SWITCHING IN OPTICAL NETWORKS". Process #1999/03886-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1999-08/2003), value: R$ 105.144,00. Project linked to the MICROWAVE AND OPTICS DEPARTMENT.
 
12
  Flavio de Melo Pereira (Responsible). "ANALYSIS OF GENERALIZED PROCESSOR SHARING SERVICE DISCIPLINE UNDER SELF-SIMILAR TRAFFIC". Process #2000/00069-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2000-01/2002), value: R$ 27.932,20.
 
13
  ALDARIO CHRESTANI BORDONALLI (Responsible). "ANALYSIS OF THE USE OF OPTICAL INJECTION LOCKING IN SIGNAL PROCESSING IN WDM SYSTEMS". Process #2001/12180-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 26.400,00. Project linked to the MICROWAVE AND OPTICS DEPARTMENT.
 
14
  Adriana F�varo Domingues (Responsible). "ANALYSIS OF INTERAREA LOW FREQUENCY ELECTROMECHANICAL OSCILLATIONS IN ELECTRICAL POWER SYSTEMS". Process #2001/07662-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-07/2004), value: R$ 75.231,00.
 
15
  CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "VOLTAGE STABILITY ANALYSIS OF ELECTRICAL POWER DISTRIBUTION SYSTEM CONTAINING DISTRIBUTED GENERATION". Process #2002/04380-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2002-07/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
16
  Vitaly F�lix Rodriguez Esquerre (Responsible). "ANALYSIS OF OPTICAL GUIDES BY FINITE ELEMENTS IN THE TIME DOMAIN". Process #1998/16202-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1999-03/2003), value: R$ 105.144,00.
 
17
  Ana Carolina Garcia Canas (Responsible). "APPLICATION OF FUZZY LOGIC IN THE ANALYSIS OF ELECTRICAL POWER NETWORKS". Process #2001/00819-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2003), value: R$ 28.728,00.
 
18
  CARLOS ALBERTO FAVARIN MURARI (Responsible). "APPLICATION OF FUZZY LOGIC IN CONTIGENCY SELECTION". Process #2002/06512-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
19
  EDSON BIM (Responsible). "APPLICATION OF STATUS OBSERVERS IN THE DIGITAL CONTROL OF PERMANENT MAGNET SYNCHRONOUS MOTOR". Process #2000/14316-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2003), value: R$ 39.533,51. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
20
  Romis Ribeiro de Faissol Attux (Responsible). "APPLICATION OF EVOLUTIONARY TECHNIQUES, "FUZZY" LOGIC AND NON-LINEAR STRUCTURES TO THE EQUALIZATION AND IDENTIFICATION OF COMMUNICATION CHANNELS". Process #2001/00680-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-04/2005), value: R$ 105.144,00.
 
21
  JOAO BATISTA DESTRO FILHO (Responsible). "SELF-TEACHING LEARNING: ANALYSIS AND APPLICATION IN TELECOMMUNICATIONS". Process #2002/01360-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-12/2002), value: R$ 20.020,00. Project linked to the COMMUNICATIONS DEPARTMENT.
 
22
  Ricardo Jos� Gabrielli Barreto Campello (Responsible). "ARCHITECTURES, METHODS AND ALGORITHMS FOR MODELING AND CONTROL OF COMPLEX SYSTEMS USING COMPUTATIONAL INTELLIGENCE TECHNIQUES". Process #1999/03902-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/1999-08/2002), value: R$ 84.435,00.
 
23
  Carolina de Mattos Affonso (Responsible). "FULFILLING MINIMUM REQUIREMENTS FOR VOLTAGE STABILITY MARGINS IN PROGRAMMING THE OPERATION OF ELECTRIC POWER SYSTEMS". Process #2000/11875-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-08/2004), value: R$ 91.338,00.
 
24
  MIGUEL GUSTAVO LIZARRAGA ESPINOSA (Responsible). "PERSONAL AUTHENTICATION THROUGH BIOMETRIC CHARACTERISTICS WITH APPLICATIONS IN COMPUTER NETWORK SECURITY". Process #2002/04763-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2002-07/2003), value: R$ 34.320,00.
 
25
  Pedro Henrique Librelon de Faria (Responsible). "AUTOMATIZATION OF AN ELECTRICAL CHARACTERIZATION SYSTEM OF FIELD EMISSION TIPS IN HIGH VACUUM". Process #2002/02373-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
 
26
  Rangel Arthur (Responsible). "OBJECTIVE ASSESSMENT OF VIDEO CODECS". Process #1999/11334-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 31.179,63.
 
27
  Alexandre Gon�alves Silva (Responsible). "IMAGE PROCESSING TOOLBOX FOR "NUMERICAL PHYTON"". Process #2000/13671-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (02/2001-01/2003), value: R$ 28.545,22.
 
28
  Lia Toledo Moreira Mota (Responsible). "LOAD BEHAVIOR IN THE RECOMPOSITION OF ELECTRICAL POWER SYSTEMS". Process #2000/11164-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2005), value: R$ 105.144,00.
 
29
  Alexandra Maria Rodrigues Cardoso (Responsible). "IMAGE COMPRESSION AND INTERPOLATION USING FRACTAL". Process #1998/16209-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-02/2003), value: R$ 105.144,00.
 
30
  Gentil Silveira Soares (Responsible). "CONTRACTILE IMPAIRMENT OF HEART TISSUE AFTER STIMULATION BY HIGH INTENSITY ELECTRIC FIELD". Process #2000/07710-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-06/2002), value: R$ 25.329,00.
 
31
  "CONSTRUCTION AND PERFORMANCE ANALYSIS OF SIGNAL CONSTELLATIONS ON MINIMAL SURFACES". Process #2000/04203-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-05/2002), value: R$ 25.910,41.
 
32
  VERA LUCIA DA SILVEIRA NANTES BUTTON (Responsible). "CONSTRUCTION AND CHARACTERIZATION OF EWO AND PWO NON-DIFFRACTIVE ULTRASONIC TRANSLATORS". Process #2001/13161-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
 
33
  "CONTRIBUTION TO THE SOLUTION OF OPTIMIZATION PROBLEMS THROUGH NEURAL NETWORKS". Process #1998/16562-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1999-09/2002), value: R$ 93.008,13.
 
34
  Marcia Tomie Takahashi (Responsible). "CONTRIBUTIONS TO THE STUDY OF FUZZY GRAPHS: THEORY, ALGORITHMS AND APPLICATIONS". Process #2000/10065-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2000-03/2004), value: R$ 89.037,00.
 
35
  Fernando Pinhabel Marafão (Responsible). "CONTROL OF ELECTRICAL POWER QUALITY THROUGH DIGITAL SIGNAL PROCESSING TECHNIQUES". Process #1999/11882-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2004), value: R$ 40.994,54.
 
36
  Eduardo Fontoura Costa (Responsible). "CONTROL OF LINEAR SYSTEMS SUBJECT TO MARKOVIAN JUMPS". Process #1998/13095-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-02/2002), value: R$ 72.244,64.
 
37
  Eduardo Fontoura Costa (Responsible). "CONTROL AND FILTERING OF LINEAR SYSTEMS SUBJECT TO MARKOVIAN JUMPS". Process #2001/12233-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 34.320,00.
 
38
  SIGMAR MAURER DECKMANN (Responsible). "Development of Methodology for Measurement and Treatment of Electrical Quantities for Recording and Management of Power Conformity". Companhia Paulista de For�ae Luz, (04/2002-04/2003), value: R$ 21.100,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
39
  Alexandre de Andrade (Responsible). "COMBINED CHANNEL AND SOURCE DECODING". Process #2001/07955-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2001-09/2004), value: R$ 77.532,00.
 
40
  HUGO ENRIQUE HERNANDEZ FIGUEROA (Responsible). "DEVELOPMENT OF MULTIPlatform GUI AND WEB COMPUTATION ENVIRONMENTS FOR VECTOR SIMULATOR OF PHOTONIC GUIDES BASED ON FINITE ELEMENTS". Process #2002/09939-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2002-11/2003), value: R$ 3.960,00. Project linked to the MICROWAVE AND OPTICS DEPARTMENT.
 
41
  Diego Rodrigues Thuler (Responsible). "DEVELOPMENT OF A SIGNAL PROCESSING CIRCUIT OF AN ULTRASONIC BLOOD FLOW METER FOR AN EXTRACORPOREAL CIRCULATION SYSTEM". Process #2001/00449-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-05/2003), value: R$ 3.960,00.
 
42
  Marcos de Araujo Paz (Responsible). "DEVELOPMENT OF TRANSMISSION LINES MODELS FOR ELECTROMAGNETIC TRANSIENT SIMULATION PROGRAMS". Process #2001/09259-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 49.920,00.
 
43
  MARIA CRISTINA DIAS TAVARES (Responsible). "DEVELOPMENT OF MODELS IN ELECTROMAGNETIC TRANSIENT PROGRAMS". Process #1998/14826-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1999-03/2003), value: R$ 119.977,29. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
44
  Keops Roger Michelotto Koto (Responsible). "DEVELOPMENT OF AN INTEGRATED OPTICAL SENSOR FOR BLOOD GLUCOSE CONCENTRATION". Process #1999/11349-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2002), value: R$ 31.200,00.
 
45
  ANTONIO AUGUSTO FASOLO QUEVEDO (Responsible). "DEVELOPMENT OF A LOW-COST SURFACE ELECTROMYOGRAPH INTERCONNECTABLE TO A PC: ACQUISITION AND ANALOG TREATMENT, CONVERSION TO/CODING". Process #2002/03434-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
 
46
  ANTONIO AUGUSTO FASOLO QUEVEDO (Responsible). "DEVELOPMENT OF A LOW-COST SURFACE ELECTROMYOGRAPH INTERCONNECTABLE TO A PC: TRANSMISSION, DECODING AND COMMUNICATION WITH TERMINAL". Process #2002/03435-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2002-06/2003), value: R$ 1.980,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
 
47
  MARCONI KOLM MADRID (Responsible). "DEVELOPMENT OF A HARDWARE SYSTEM FOR TRACKING CONTINUOUS TRAJECTORIES OF INDUSTRIAL ROBOTS BASED ON HEURISTIC SEARCH AND ARTIFICIAL VISION". Process #2002/05046-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-04/2005), value: R$ 68.328,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
48
  Marcel Abrantes (Responsible). "DEVELOPMENT OF AN ITERFACE BETWEEN MTK AND SPACEBALL". Process #2002/01161-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
 
49
  CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "DETERMINATION OF CRITICAL BAR AND TENSION COLLAPSE POINT USING THE TANGENT VECTOR". Process #2002/05987-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
50
  JOSE WILSON MAGALHAES BASSANI (Responsible). "DETERMINATION OF THE LETHAL ELECTRIC FIELD FOR ISOLATED HEART CELLS". Process #2000/03833-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-06/2002), value: R$ 7.920,00.
 
51
  MICHEL DAOUD YACOUB (Responsible). "RICE DISTRIBUTION AND ANALYTICAL APPROACHES TO ITS AVERAGE". Process #2002/03318-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 3.960,00. Project linked to the COMMUNICATIONS DEPARTMENT.
 
52
  Michel Zamboni Rached (Responsible). "EFFECTS OF POLARIZATION AND NON-LINEARITIES IN WDM OPTICAL SYSTEMS". Process #2000/09386-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2004), value: R$ 105.144,00.
 
53
  "STABILITY AND CONTROL OF LINEAR SYSTEMS WITH NON-LINEAR ELEMENTS". Process #2000/12632-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2005), value: R$ 105.144,00.
 
54
  Eduardo Nobuhiro Asada (Responsible). "GENERALIZED STATE ESTIMATION IN ELECTRIC POWER SYSTEMS DETERMINATION OF STATES AND PARAMETERS". Process #1999/11426-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-03/2004), value: R$ 100.542,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
55
  CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "QUICK ESTIMATION OF THE MAXIMUM LOADING POINT FOR VOLTAGE STABILITY ANALYSIS OF BRIDGE ELECTRICAL SYSTEMS". Process #2001/13024-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-08/2004), value: R$ 63.726,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
56
  Jos� Renato de Paula Naves (Responsible). "EVOLUTIONARY STRATEGIES FOR OPTICAL NETWORKING FROM WDM RINGS". Process #2000/04262-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2002), value: R$ 27.182,68.
 
57
  ROSANGELA BALLINI (Responsible). "STRUCTURE AND LEARNING OF DYNAMIC NEURAL NEURAL NETWORKS". Process #2000/06198-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-07/2002), value: R$ 61.013,30.
 
58
  VERA LUCIA DA SILVEIRA NANTES BUTTON (Responsible). "STUDY OF THE PODIIZATION OF PIEZOELECTRIC CERAMICS TO REDUCE ACOUSTIC DIFFRACTION IN THE FIELD GENERATED BY ULTRASOUND TRANSDUCERS". Process #2000/12492-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-03/2003), value: R$ 38.274,78. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
 
59
  IOSHIAKI DOI (Responsible). "STUDY OF THE SI-POLY LAYER FOR DOORS OF MOS STRUCTURES AND MICROSTRUCTURES". Process #1999/07617-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2000-06/2002), value: R$ 174.693,12. Project linked to the DEPT. OF MACHINE COMPONENTS AND INTELLIGENT SYSTEMS.
 
60
  ARIOVALDO VERANDIO GARCIA (Responsible). "STUDY OF THE TRANSMISSION CAPACITY OF INTERCONNECTED SYSTEMS IN THE NEW MODEL OF ELECTRIC POWER SYSTEMS". Process #2001/13258-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-12/2002), value: R$ 1.980,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
61
  Kl�ber Zuza Nobrega (Responsible). "STUDY OF THE INTERACTION OF VECTOR SPATIAL SOLITONS AND THEIR APPLICATIONS IN THE DESIGN OF PHOTONIC DEVICES". Process #2000/04593-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-04/2004), value: R$ 102.843,00.
 
62
  "STUDY OF THE INTERACTIONS OF POLYCRYSTALLINE DIAMOND WITH BONE TISSUE AND ITS APPLICATIONS IN THE COATING OF ORTHOPEDIC PROSTHESES". Process #2000/08274-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2002), value: R$ 7.920,00.
 
63
  Rodrigo Pereira Ramos (Responsible). "PERFORMANCE STUDY OF CDMA SYSTEMS IN TCP/IP NETWORKS". Process #2001/03213-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2001-05/2005), value: R$ 105.144,00.
 
64
  "STUDY OF THE MANUFACTURE PROCESS OF POWER "SCHOTTKY" DIODE". Process #2000/14255-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2003), value: R$ 28.728,00.
 
65
  Adriana Scheffer Quintela Ferreira (Responsible). "STUDY OF A PROXIMITY INDEX TO THE VOLTAGE STABILITY LIMIT AND ITS APPLICATION IN THE SELECTION OF CONTINGENCIES". Process #2000/07711-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-08/2002), value: R$ 26.972,63. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
66
  Jorge Andr� Gir�o Albuquerque (Responsible). "STUDY AND CHARACTERIZATION OF ULTRASOUND IMAGES OBTAINED WITH CONTRAST AGENTS". Process #2001/00670-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-06/2005), value: R$ 105.144,00.
 
67
  ERNESTO RUPPERT FILHO (Responsible). "STUDY AND CONSTRUCTION OF A THREE-PHASE ACTIVE FILTER FOR UNBALANCED FOUR-WIRE LOADS". Process #2002/05718-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
68
  Gustavo Fraidenraich (Responsible). "STUDY ON THE EFFECTS OF INTERCHANNEL AND INTERPATH INTERFERENCES ON RECEIVERS OF WIDE-BAND CDMA SYSTEMS". Process #2000/07633-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-07/2002), value: R$ 25.887,30.
 
69
  Eduardo Javier Huerta Yero (Responsible). "STUDY ON MASSIVELY PARALLEL PROCESSING ON THE INTERNET". Process #1998/04305-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1998-08/2002), value: R$ 105.076,61.
 
70
  Daniel Tost (Responsible). "EXTENSION OF 3D CURSOR EMULATION FUNCTIONS IN MTK". Process #2002/01162-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
 
71
  Lesnir Ferreira Porto (Responsible). "MANUFACTURING AND ELECTRICAL CHARACTERIZATION OF FIELD EMISSION TIPS IN HIGH VACUUM". Process #2002/02374-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00.
 
72
  LUIZ CARLOS PEREIRA DA SILVA (Responsible). "TRANSMISSION LOSSES ALLOCATION FACTORS IN A COMPETITIVE ELECTRIC POWER MARKET: AN EQUITABLE DEFINITION BASED ON AC LOAD FLOW". Process #2002/05029-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2002-09/2005), value: R$ 77.532,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
73
  Ricardo Grossi Dantas (Responsible). "COMPUTAL TOOLS FOR PROCESSING ULTRASONIC IMAGES OBTAINED BY "B" MODE". Process #2000/00402-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2000-04/2004), value: R$ 77.532,00.
 
74
  EDMUNDO DA SILVA BRAGA (Responsible). "HYDROGENATED AMORPHOUS CARBON FILMS FOR ELECTRICAL AND OPTICAL APPLICATIONS". Process #1999/04871-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/1999-10/2002), value: R$ 124.920,05. Project linked to the DEPARTMENT OF ELECTRONICS AND MICROELECTRONICS.
 
75
  CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "CONTINUATION LOAD FLOW: AUTOMATIC DETERMINATION OF THE CONTINUATION PARAMETER". Process #2001/10968-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2004), value: R$ 26.400,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
76
  PAULO AUGUSTO VALENTE FERREIRA (Responsible). "DYNAMIC IDENTIFICATION AND LONGITUDINAL CONTROL OF AN AUTONOMOUS ROBOTIC AIRSHIP". Process #2001/12425-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 26.400,00. Project linked to the TELEMATICS DEPARTMENT.
 
77
  EDUARDO TAVARES COSTA (Responsible). "IMPLEMENTATION OF PROGRAMS IN OPEN SYSTEMS FOR REMOTE ACCESS TO LUS/CEB MEASUREMENT EQUIPMENT". Process #2001/14211-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
 
78
  SECONDINO SOARES FILHO (Responsible). "INFLUENCE OF SPATIAL CORRELATION ON THE FORECASTING OF INFLUENT FLOWS". Process #2001/13351-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2005), value: R$ 77.532,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
 
79
  FERNANDO ANTONIO CAMPOS GOMIDE (Responsible). "COMPUTER INTELLIGENCE AND MULTI-AGENT SYSTEMS IN COMPUTING MARKET SYSTEMS AND MODELS: ANALYSIS, ALGORITHMS AND APPLICATIONS". Process #2001/13568-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2005), value: R$ 77.532,00. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
 
80
  Edilson Fernandes de Arruda (Responsible). "SIMPLE POLICY INVESTIGATION IN INVESTMENT AND PRODUCTION PROBLEMS IN THE PRESENCE OF UNCERTAINTY". Process #2000/06524-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2002), value: R$ 20.834,06.
 
81
  CARLOS RODRIGUES DE SOUZA (Responsible). "SURVEY OF EXPERIMENTAL DATA FOR MODELING A SECTOR ENGINE VIA ARTIFICIAL NEURAL NETWORKS". Process #2000/10715-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-02/2002), value: R$ 8.686,01. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
82
  Francisco de Assis Zampirolli (Responsible), ROBERTO DE ALENCAR LOTUFO (Responsible). "PROGRAMMING LANGUAGE FOR ARCHITECTURE-INDEPENDENT MORPHOLOGICAL ALGORITHMS". Process #1998/06641-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/1998-01/2002), value: R$ 77.401,05. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
 
83
  JACOBUS WILLIBRORDUS SWART (Responsible). "MAINTENANCE OF IONIUM IMPLEMENTATION SYSTEM FOR RESEARCH IN MICROELECTRONICS AND MATERIALS". Process #2000/08826-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2003), value: R$ 1.352.544,10. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
 
84
  Jayme Garcia Arnal Barbedo (Responsible). "OBJECTIVE MEASURE FOR ASSESSING THE QUALITY OF AUDIO CODECS". Process #2001/04144-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2005), value: R$ 105.144,00.
 
85
  Igor Kopcak (Responsible). "IMPROVEMENT OF VOLTAGE STABILITY MARGINS IN THE PROBLEM OF PRE-DISPATNESS OF THE OPERATION THROUGH MINIMUM LOAD SHUTTING". Process #2001/03639-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-03/2003), value: R$ 25.329,00.
 
86
  Almir Laranjeira Neri Junior (Responsible). "ALTERNATIVE METHODS FOR DRIVING THE FRACTIONAL TWO-PHASE INDUCTION MOTOR: LOAD TESTS, IMPROVEMENTS IN THE DIMMER METHOD AND PATENT IABILITY ANALYSIS". Process #2001/04622-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-12/2002), value: R$ 5.610,00.
 
87
  Anibal Tavares de Azevedo (Responsible). "INTERIOR POINT METHODS APPLIED TO GENERALIZED GRAPH PROBLEMS WITH ADDITIONAL CONSTRAINTS". Process #1999/12071-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2002), value: R$ 28.574,89.
 
88
  Marco Antonio Robert Alves (Responsible). "VACUUM FIELD EMISSION MICRODEVICES". Process #2000/04585-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2003), value: R$ 223.227,00.
 
89
  Marco Antonio Robert Alves (Responsible). "VACUUM FIELD EMISSION MICRODEVICES". Process #2000/08493-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2003), value: R$ 97.713,00.
 
90
  Annabell del Real Tamariz (Responsible). "COMPUTATIONAL DATA MODELING AND INTELLIGENT CONTROL IN STATE SPACE". Process #1998/15357-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/1999-04/2003), value: R$ 106.739,50.
 
91
  Leandro Tiago Man�ra (Responsible). "MODELING OF MOS STRUCTURES". Process #2000/05136-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2000-04/2002), value: R$ 27.183,00.
 
92
  Sahudy Montenegro González (Responsible). "MODEL FOR MANAGING IMAGE DATABASES". Process #1999/04150-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1999-06/2003), value: R$ 105.144,00.
 
93
  ANA CRISTINA CAVALCANTI LYRA (Responsible). "THE STUDY OF THE DOUBLE EXCITED MACHINE". Process #2001/13658-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 26.400,00. Project linked to the DEPT. OF MACHINE COMPONENTS AND INTELLIGENT SYSTEMS.
 
94
  Karcius Day Ros�rio Assis (Responsible). "SUPPORT FOR INTERNET TRAFFIC THROUGH THE OPTICAL NETWORK". Process #2000/08863-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-09/2004), value: R$ 105.144,00.
 
95
  Helder Jos� Ceragioli (Responsible). "OBTAINING POROUS DIAMOND FILTERS IN THE FORM OF MEMBRANES AND TUBES". Process #2000/14846-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-06/2003), value: R$ 68.640,00.
 
96
  PAULO AUGUSTO VALENTE FERREIRA (Responsible). "GLOBAL MULTI-OBJECTIVE OPTIMIZATION". Process #2001/09257-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-04/2004), value: R$ 53.460,00. Project linked to the TELEMATICS DEPARTMENT.
 
97
  Denise Sato Yamashita (Responsible), VINICIUS AMARAL ARMENTANO (Responsible). "ROBUST OPTIMIZATION APPLIED TO RESOURCE PLANNING AND PROGRAMMING OF PROJECT ACTIVITIES". Process #1999/06212-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1999-08/2003), value: R$ 105.144,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
 
98
  PAULO MORELATO FRANCA (Responsible). "PLANNING OF THE SECONDARY ELECTRIC POWER DISTRIBUTION NETWORK". Process #2001/06773-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-07/2002), value: R$ 5.335,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
 
99
  SECONDINO SOARES FILHO (Responsible). "PLANNING AND PROGRAMMING OF THE OPERATION OF ELECTRIC POWER SYSTEMS". Process #1999/12737-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2004), value: R$ 336.682,62. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
 
100
  LUIZ CARLOS PEREIRA DA SILVA (Responsible). "PRE-DISCRIPTION OF THE OPERATION OF ELECTRICAL POWER SYSTEMS INCLUDING VOLTAGE STABILITY RESTRICTIONS". Process #2001/00164-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-07/2002), value: R$ 45.760,00.
 
101
  ARIOVALDO VERANDIO GARCIA (Responsible). "WORKLOAD FORECASTING USING ARTIFICIAL NEURAL NETWORKS". Process #2002/00647-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2003), value: R$ 1.320,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
102
  "JOINT PROBLEM OF BATCH SIZING AND PRODUCTION SCHEDULING". Process #2000/02609-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2004), value: R$ 105.144,00.
 
103
  "PROCEDURES FOR HYBRID COMPRESSION METHOD IN DIGITAL VIDEO PROCESSING, APPLYING "WAVELET - (PDI)" TRANSFORM". Process #2000/11156-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2005), value: R$ 105.144,00.
 
104
  Fernando Silvestre da Silva (Responsible). "PROCEDURES FOR IMAGE TREATMENT AND COMPRESSION USING FRACTAL TECHNOLOGY (PDI)". Process #2000/11157-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-04/2005), value: R$ 105.144,00.
 
105
  JACOBUS WILLIBRORDUS SWART (Responsible). "SPECIAL PROGRAM FOR MANUFACTURE OF INTEGRATED CIRCUITS ABROAD PHASE 4". Process #2001/04989-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2003), value: R$ 1.335.844,20. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
 
106
  Luciana Martinez (Responsible). "DUAL STOCHASTIC DYNAMIC PROGRAMMING APPLIED TO PLANNING THE ENERGY OPERATION OF HYDROELECTRICAL SYSTEMS". Process #2001/13412-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-06/2003), value: R$ 34.320,00.
 
107
  Marcelo Gradella Villalva (Responsible). "DESIGN AND CONSTRUCTION OF A THREE-WIRE ACTIVE POWER FILTER". Process #2001/08948-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2001-06/2002), value: R$ 2.640,00.
 
108
  Leonardo Breseghello Zoccal (Responsible). "DESIGN AND MANUFACTURE OF MONOLITHIC MICROWAVE INTEGRATED CIRCUIT (MMIC)". Process #1999/11351-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 31.199,99.
 
109
  "DESIGN AND IMPLEMENTATION OF AN OPEN SOURCE COMPUTATIONAL PLATFORM TO AID THE TEACHING OF MICROELECTRONICS". Process #2000/09027-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2001-08/2002), value: R$ 24.196,00.
 
110
  Marcos Augusto de Goes (Responsible). "INTEGRATED OPTICAL RECEIVER FOR HIGH CAPACITY COMMUNICATION SYSTEMS USING BIPOLAR HETEROJUNCTION TRANSISTORS". Process #1999/11350-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 31.200,00.
 
111
  LUIS GERALDO PEDROSO MELONI (Responsible). "AUTOMATIC SPEECH RECOGNITION IN REAL TIME". Process #2002/05686-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the COMMUNICATIONS DEPARTMENT.
 
112
  Mercedes Roc�o Gonzales M�rquez (Responsible). "RECONSTRUCTION OF A "3D" MODEL FROM MULTIPLE DEPTH IMAGES". Process #2000/10913-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-11/2004), value: R$ 105.144,00.
 
113
  Taciana de Vasconcelos Menezes (Responsible). "REACTIVE REDISCRIPTION VIA MODAL PARTICIPATION FACTORS FOR IMPROVING VOLTAGE STABILITY MARGINS IN ELECTRIC POWER SYSTEMS". Process #2000/10221-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-09/2002), value: R$ 26.455,90.
 
114
  PEDRO LUIS DIAS PERES (Responsible). "TECHNICAL RESERVE - FAPESP POSTGRADUATE SCHOLARSHIP IN THE COUNTRY - (97/13703-5)". Process #1998/02629-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1998-02/2002), value: R$ 4.587,00. Project linked to the TELEMATICS DEPARTMENT.
 
115
  CARLOS ALBERTO DE CASTRO JUNIOR (Responsible). "SOLVING THE LOAD FLOW PROBLEM FOR DISTRIBUTION NETWORKS USING THE FAST DECOUPLED METHOD WITH OPTIMAL AXLE ROTATION". Process #2002/05986-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2002-07/2003), value: R$ 1.980,00. Project linked to the DEPARTMENT OF ELECTRIC POWER SYSTEMS.
 
116
  "HIGH QUALITY RECTIFIERS WITH LOW FREQUENCY SWITCHING". Process #1999/09400-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-05/2002), value: R$ 90.067,98.
 
117
  Eduardo da Silva Martins (Responsible). "SINGLE-PHASE RECTIFIERS WITH HIGH POWER FACTOR AND LOW FREQUENCY SWITCHING". Process #2000/01670-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2002), value: R$ 31.200,00.
 
118
  Joanna Helena Mantelli A. Gomes Marafão (Responsible). "THREE-PHASE RECTIFIERS WITH HIGH POWER FACTOR USING LOW FREQUENCY SWITCHING". Process #1999/12240-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2002), value: R$ 30.805,51.
 
119
  Jonatas Fred Rossetto (Responsible). "DISTRIBUTED SENSOR USING NON-LINEAR EFFECTS IN OPTICAL FIBERS FOR APPLICATION IN INTELLIGENT STRUCTURES". Process #2000/09731-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-10/2004), value: R$ 93.639,00.
 
120
  VITOR BARANAUSKAS (Responsible). "GAS SENSORS FROM POROUS TIN DIOXIDE THIN FILM". Process #2001/08700-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-07/2004), value: R$ 61.425,00. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
 
121
  Mauricio Luis Bottoli (Responsible). "SIMULATION OF WDM OPTICAL NETWORKS". Process #1998/15467-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/1999-04/2003), value: R$ 105.144,00.
 
122
  VERA LUCIA DA SILVEIRA NANTES BUTTON (Responsible). "SIMULATION OF THE ACOUSTIC FIELD GENERATED BY A NON-DIFFRACTIVE X-WAVE ULTRASONIC TRANSDUCER". Process #2001/13163-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
 
123
  ERNESTO RUPPERT FILHO (Responsible). "SIMULATING THE BEHAVIOR OF A THREE-PHASE INVERTER AT THREE LEVELS FEEDING A THREE-PHASE INDUCTION MOTOR". Process #2002/01264-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 3.960,00. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
124
  Hayram Nicício (Responsible). "SIMULATION AND MEASUREMENT OF THREE-DIMENSIONAL ULTRASONIC FIELDS FOR TRANSDUCER CHARACTERIZATION". Process #2000/00074-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-03/2002), value: R$ 27.165,55.
 
125
  Leticia Santos da Rocha (Responsible). "ACTIVITY-BASED COSTING SYSTEM FOR MANAGING THE MAINTENANCE PROCESS OF MEDICAL CARE EQUIPMENT". Process #2001/05944-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-04/2005), value: R$ 98.241,00.
 
126
  Ricardo Quadros Machado (Responsible), Ricardo Quadros Machado (Responsible). "HYBRID CO-GENERATION SYSTEM WITH ELECTRONIC POWER CONDITIONING AND DIGITAL CONTROL". Process #2000/11038-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2000-10/2004), value: R$ 41.093,90.
 
127
  JOSE ANTENOR POMILIO (Responsible). "INTEGRATED ENERGY SYSTEM BASED ON FUEL CELLS FOR APPLICATION IN SMALL ELECTRICAL PLANTS". Process #2000/13784-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-12/2002), value: R$ 30.124,59. Project linked to the ENERGY SYSTEMS AND CONTROL DEPARTMENT.
 
128
  JOSE WILSON MAGALHAES BASSANI (Responsible). "Telecommunications and Applications for Telemedicine and Teleeducation". Financing of Studies and Projects, (12/2000-12/2002), value: US$ 990.948,25. Project linked to the DEPARTMENT OF BIOMEDICAL ENGINEERING.
 
129
  Maurício Sol de Castro (Responsible). "SELF-TEACHING EQUALIZATION TECHNIQUES IN A MULTICHANNEL ENVIRONMENT". Process #2000/02206-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-04/2002), value: R$ 26.829,49.
 
130
  Victor Kazuo Tatai (Responsible). "INTELLIGENT SYSTEMS TECHNIQUES APPLIED TO THE DEVELOPMENT OF COMPUTER GAMES". Process #2000/07631-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2002), value: R$ 28.692,00.
 
131
  Davi Correia (Responsible). "META-HEURISTIC OPTIMIZATION TECHNIQUES IN THE SYNTHESIS OF OPTICAL WAVEGUIDES". Process #2000/04371-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-03/2002), value: R$ 28.251,85.
 
132
  EDSON MOSCHIM (Responsible). "TESTS AND SPACE APPLICATIONS OF RADIATION SENSORS IN THE THZ BAND". Process #2002/04774-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-04/2004), value: R$ 21.868,00. Project linked to the DEPARTMENT OF SEMICONDUCTORS INSTRUMENTS AND PHOTONICS.
 
133
  LUIS GIMENO Y LATRE (Responsible). "Sequential Techniques for Supply Chain Planning". Coordination of the Improvement of Higher Education Personnel, (01/2002-), value: R$ 19.400,00. Project linked to the DEPT. COMPUTING ENGINEERING INDUSTRIAL AUTOMATION.
 
134
  ALDARIO CHRESTANI BORDONALLI (Responsible). "TOPOLOGIES FOR OPTIMIZING THE PERFORMANCE OF DOPED FIBER OPTICAL AMPLIFIERS". Process #2001/09806-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-12/2003), value: R$ 175.408,19.
 
135
  Mois�s Vidal Ribeiro (Responsible). "TRANSMISSION AND EQUALIZATION BY SUB-BANDS AND IMPULSIVE NOISE CONCELLATION FOR EFFICIENT USE OF PLC (POWERLINE COMMUNICATION) CHANNELS". Process #2001/08513-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2001-09/2004), value: R$ 77.532,00.
 
136
  PAULO MORELATO FRANCA (Responsible). "AN ENVIRONMENT FOR RESOLVING MULTI-CRITERIA COMBINATORY OPTIMIZATION PROBLEMS OF ELECTRIC POWER DISTRIBUTION SYSTEMS". Process #2002/08800-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2002-03/2005), value: R$ 61.425,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
 
137
  TAKAAKI OHISHI (Responsible). "A BUS LOAD PREDICTION MODEL". Process #2002/06733-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the SYSTEMS ENGINEERING DEPARTMENT.
 
138
  "A BIOMETRIC PERSONAL IDENTIFICATION SYSTEM WITH BIO-CRYPTOGRAPHY CHARACTERISTICS IN LOCAL NETWORKS OR INTERNET". Process #2000/12641-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2005), value: R$ 105.144,00.
 
139
  Marcelo Augusto Cicogna (Responsible). "AN OBJECT-ORIENTED COMPUTATION SYSTEM FOR COMPARING OPERATING POLICIES OF HYDROTHERMAL POWER SYSTEMS". Process #1998/16269-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-02/2003), value: R$ 105.144,00.
 
140
  Wagner Luiz Alves de Oliveira (Responsible). "AN APPROACH TO MODELING DIGITAL SYSTEMS". Process #1999/04321-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2000-12/2003), value: R$ 105.144,00.
 
141
  Sandra Kise Uehara (Responsible). "A METHODOLOGY FOR CALCULATING "SPOT PRICE" WITH SECURITY RESTRICTIONS". Process #2000/06345-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2002), value: R$ 19.371,29.