Faculty of Mechanical Engineering
 
Projects with financing
 
1.
  Edna Lopes Ramalho (Responsible). "THE ACTIVITY OF STATE CONTROL BODIES IN GUARANTEING THE EFFICIENCY OF PUBLIC ELECTRIC ENERGY SERVICES - CSPE CASE STUDY - PUBLIC SERVICES COMMISSION OF THE STATE OF SAO PAULO". Process #1999/08238-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2000-04/2004), value: R$ 105.144,00.
 
2.
  Carlos Machado de Oliveira (Responsible). "ENVIRONMENT FOR COMPANY MODELING". Process #1999/10551-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2000-07/2004), value: R$ 105.144,00.
 
3.
  MARIA HELENA ROBERT (Responsible). "Analysis of Structural Modifications During Steel Recasting". Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
4.
  JOSE ROBERTO DE FRANCA ARRUDA (Responsible). "Vibroacoustic analysis of hermetic compressors". Tecumseh from Brazil, (09/1999-01/2002), value: US$5.500,00. Project linked to the DEPARTMENT OF COMPUTATIONAL MECHANICS.
 
5.
  RENATO PAVANELLO (Responsible). "COMPARATIVE AND PERFORMANCE ANALYSIS OF THIN SHELL FINITE ELEMENTS". Process #2001/12888-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2004), value: R$ 26.400,00. Project linked to the DEPARTMENT OF COMPUTATIONAL MECHANICS.
 
6.
  SILVIA AZUCENA NEBRA DE PEREZ (Responsible). "ANALYSIS OF COGENERATION ALTERNATIVES IN THE SUGAR AND ALCOHOLIC INDUSTRY. CASE STUDIES". Process #1999/01431-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2003), value: R$ 77.532,00.
 
7.
  AMAURI GARCIA (Responsible). "ANALYSIS OF THERMAL, STRUCTURAL AND COMPOSITION PARAMETERS IN VERTICAL UNIDIRECTIONAL SOLIDIFICATION (UP AND DOWN) OF BINARY ALLOYS". Process #2002/00527-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2005), value: R$ 77.532,00. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
8.
  "ANALYSIS OF THE EFFECTS OF SOLIDIFICATION KINETICS ON SOLUTE REDISTRIBUTION". Process #2000/05964-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2000-07/2004), value: R$ 105.144,00.
 
9.
  EUCLIDES DE MESQUITA NETO (Responsible). "STATIC AND DYNAMIC ANALYSIS OF A POLYHEDRAL SHEETS MODEL FOR THE STUDY OF SLABS WITH INCORPORATED STEEL SHAPE (STEEL DECK) USING THE CONTOUR ELEMENT METHOD". Process #1998/11027-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/1998-09/2002), value: R$ 105.144,00. Project linked to the DEPARTMENT OF COMPUTATIONAL MECHANICS.
 
10
  JOSE MANOEL BALTHAZAR (Responsible). "NON-LINEAR ANALYSIS OF NON-IDEAL HALONOMIC DYNAMIC SYSTEMS". Process #1998/15968-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-06/2002), value: R$ 79.479,47.
 
11
  PAULO SOLLERO (Responsible). "NUMERICAL ANALYSIS OF PLATES OF LAMINATED COMPOSITE MATERIALS USING THE BOUNDARY ELEMENT METHOD". Process #2001/06493-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2001-11/2003), value: R$ 68.640,00.
 
12
  LUIZ FERNANDO MILANEZ (Responsible). "NUMERICAL ANALYSIS OF HEAT TRANSFER PROBLEMS IN ELECTRONIC EQUIPMENT". Process #2000/09144-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-09/2003), value: R$ 29.651,75. Project linked to the ENERGY DEPARTMENT.
 
13
  PAULO SOLLERO (Responsible). "NUMERICAL ANALYSIS OF DYNAMIC PROBLEMS IN COMPOSITE MATERIALS SUBJECT TO BENDING USING BOUNDARY ELEMENT METHODS". Process #2001/00785-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-04/2005), value: R$ 105.144,00.
 
14
  SILVIA AZUCENA NEBRA DE PEREZ (Responsible). "THERMOECONOMIC ANALYSIS/OTIMIZATION OF DIFFERENT HYDROGEN PRODUCTION PROCESSES FROM NATURAL GAS". Process #2001/06104-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2005), value: R$ 105.144,00.
 
15
  CELIA MARINA DE ALVARENGA FREIRE (Responsible). "ANODIZING OF ALUMINUM ALLOYS BY PULSED CURRENT". Process #1999/09110-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2004), value: R$ 105.144,00.
 
16
  GILBERTO DE MARTINO JANNUZZI (Responsible). "THE POSSIBILITIES FOR DISTRIBUTED GENERATION IN THE LOW VOLTAGE NETWORK: TECHNICAL, ECONOMIC ASPECTS AND REGULATORY POLICIES". Process #2001/00895-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2001-05/2003), value: R$ 48.028,31. Project linked to the ENERGY DEPARTMENT.
 
17
  AUTELIANO ANTUNES DOS SANTOS JUNIOR (Responsible). "Evaluation of Stresses in Welded Pipes Using the Acoustoelastic Effect". Financier of Studies and Projects, (04/2001-), value: US$ 80.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
18
  CELSO KAZUYUKI MOROOKA (Responsible). "Fatigue Assessment". Petr�leo Brasileiro S/A, (05/2002-12/2003), value: US$ 50.403,23. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
19
  WALDIR ANTONIO BIZZO (Responsible). "ENVIRONMENTAL ASSESSMENT OF THE LEAD RECYCLING PROCESS". Process #2001/05940-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2003), value: R$ 12.781,25. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
20
  AUTELIANO ANTUNES DOS SANTOS JUNIOR (Responsible). "ASSESSMENT OF RELAXATION AND RESIDUAL STRESSES IN WELDED PLATES USING THE ACOUSTOELASTIC EFFECT". Process #2000/12430-0, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (05/2001-04/2003), value: R$ 53.011,59. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
21
  AUTELIANO ANTUNES DOS SANTOS JUNIOR (Responsible). "EVALUATION OF RESIDUAL STRESSES IN ALUMINUM SHEET USING THE ACOUSTOELASTIC EFFECT". Process #2002/00878-1, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 3.960,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
22
  Ra�l Ernesto L�pez Palacio (Responsible). "HIGH PERFORMANCE COMPOSITE BIOMATERIALS FOR DENTISTRY - OBTAINING AND PHYSICAL-MECHANICAL-BIOLOGICAL CHARACTERIZATION". Process #1999/02348-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/1999-03/2003), value: R$ 91.338,00.
 
23
  JOSE RICARDO FIGUEIREDO (Responsible). "Low Capacity Heat Pumps (coolers-heaters) Powered by Natural Gas". Financing of Studies and Projects, (12/2001-12/2003), value: US$ 27.726,77; Petr�leo Brasileiro S/A, (12/2001-01/2003), value: US$ 53.937,20. Project linked to the ENERGY DEPARTMENT.
 
24
  JANITO VAQUEIRO FERREIRA (Responsible). "Submarine multiphase pumping". Financing of Studies and Projects, (03/2000-03/2002), value: US$ 32.239,49; Petr�leo Brasileiro S/A, (04/2000-05/2001), value: US$ 5.627,46. Project linked to the DEPARTMENT OF COMPUTATIONAL MECHANICS.
 
25
  ARAI AUGUSTA BERNARDEZ PECORA (Responsible). "Characterization of Foundry Sand in the Analysis of the Thermal Regeneration Process in Fluidized Bed". State University of Campinas, (07/2001-), value: US$ 1,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
26
  Jeferson Cassiano (Responsible). "HOMOCLINICAL CHAOS: APPLICATIONS IN ENGINEERING SCIENCE". Process #2001/13578-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2005), value: R$ 77.532,00.
 
27
  Marcolino Fernandes Neto (Responsible). "CHARACTERIZATION OF NON-METALLIC INCLUSIONS THROUGHOUT THE PREPARATION AND SOLIDIFICATION STEPS OF STEEL PRODUCED BY CONTINUOUS CASTING". Process #2000/13487-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2002), value: R$ 34.320,00.
 
28
  Peterson Luiz Ferrandini (Responsible). "CHARACTERIZATION OF THE MECHANICAL BEHAVIOR OF THE INTERMETALLIC COMPOUND NB2A1". Process #1998/14841-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/1999-07/2002), value: R$ 73.135,02.
 
29
  ELIANA CRISTINA DA SILVA RIGO (Responsible). "PHYSICAL CHARACTERIZATION OF BIOACTIVE COATINGS ON METALLIC SURFACES". Process #2000/12556-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2003), value: R$ 68.640,00.
 
30
  ANTONIO CELSO FONSECA DE ARRUDA (Responsible), Lu�s Alberto dos Santos (Responsible). "FIBER REINFORCED CALCIUM PHOSPHATE BONE CEMENTS". Process #1998/00563-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1998-02/2002), value: R$ 102.801,98. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
31
  CELSO KAZUYUKI MOROOKA (Responsible). "Technical Consulting". National Petroleum Agency, (03/2002-03/2003), value: US$ 799.569,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
32
  CARLOS ALBERTO CARRASCO ALTEMANI (Responsible). "Contamination of oil in water and water in oil in Loading and Unloading Operations of Marine Structural Tanks". Project linked to the ENERGY DEPARTMENT.
 
33
  "COMPARISON BETWEEN THE TECHNIQUES OF THERMOGRAVIMETRIC ANALYSIS AND FLUIDIZED BED FOR BIOMASS PYROLYSIS". Process #2000/03840-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2002), value: R$ 28.728,00.
 
34
  PAULO ROBERTO GARDEL KURKA (Responsible). "CONSTRUCTION OF AN AUTOMATED SYSTEM FOR LIGHTING CONTROL THROUGH LIGHT SCANNERS". Process #2002/07719-6, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (11/2002-10/2003), value: R$ 8.497,16. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
35
  AUTELIANO ANTUNES DOS SANTOS JUNIOR (Responsible). "CONTACT WITH RAIL WHEEL AND ITS INFLUENCE ON LIFE IN RAILWAY WHEELS SERVICE". Process #2001/14538-5, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 3.960,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
36
  Rosa Cristina Cecche Lintz (Responsible). "CONTRIBUTION TO THE STUDY OF THE APPLICATION OF PORTLAND CEMENT COMPOSITES IN MACHINE TOOL STRUCTURES". Process #1998/09793-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/1999-11/2003), value: R$ 105.144,00.
 
37
  JOSE ROBERTO DE FRANCA ARRUDA (Responsible). "ACTIVE CONTROL OF VIBRATION VIA STRUCTURAL INTERSYMMETRY". Process #1998/06248-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/1998-01/2002), value: R$ 142.849,94. Project linked to the DEPARTMENT OF COMPUTATIONAL MECHANICS.
 
38
  ALBERTO LUIZ SERPA (Responsible). "CONTROL OF FLEXIBLE STRUCTURES FROM THE HINFINITO POINT OF VIEW: SOLUTION BY RICCATTI AND LMI". Process #2002/09426-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2002-11/2003), value: R$ 3.960,00. Project linked to the DEPARTMENT OF COMPUTATIONAL MECHANICS.
 
39
  Tito Dias J�nior (Responsible). "THREE DIMENSIONAL NATURAL CONVECTION OVER POINT HEAT SOURCES". Process #1999/12588-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2004), value: R$ 105.144,00.
 
40
  "GROWTH OF HYDROXYAPATITE LAYER ON METALLIC SUBSTRATES VIA THE BIOMIMETIC METHOD". Process #2000/12065-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (02/2001-01/2002), value: R$ 3.960,00.
 
41
  DENIS JOSE SCHIOZER (Responsible). "Specialization Courses". Petr�leo Brasileiro S/A, (08/2002-11/2002), value: US$ 51.612,90. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
42
  DENIS JOSE SCHIOZER (Responsible). "Development of Activities of the Master's Course in Petroleum Science and Engineering, with Reservoir concentration areas". Petr�leo Brasileiro S/A, (11/2001-12/2002), value: US$ 32.161,73. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
43
  FRANCO GIUSEPPE DEDINI (Responsible). "Development of Tools Applied to Mechanical Design with emphasis on Methodological Aspects and Parameter Optimization". Process #300397/95-0, National Council for Scientific and Technological Development, (03/2000-02/2002), value: US$ 8.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
44
  KAMAL ABDEL RADI ISMAIL (Responsible). "Development of an integrated system for residential white goods with natural gas (absorbed air)". Federal University of Pernambuco, (10/2001-), value: US$ 100,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
45
  KAMAL ABDEL RADI ISMAIL (Responsible). "Development of drying technology for regional industries". Federal University of Pernambuco, (11/2001-), value: US$ 100,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
46
  LEONARDO GOLDSTEIN JUNIOR (Responsible). "Development of an Electrodynamic-Capacitive Meter to Measure FCC Catalyst Discharge in a Standpipe of a Petroleum Catalytic Cracking Pilot Plant". Petr�leo Brasileiro S/A, (07/2002-12/2003), value: R$ 85.000,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
47
  ANTONIO CARLOS BANNWART (Responsible). "Technological Development of Oil and Gas Production Systems". Process #CNPq/CTpetro, National Council for Scientific and Technological Development, (01/2000-), value: US$ 25,00. Project linked to the ENERGY DEPARTMENT.
 
48
  RODNEI BERTAZZOLI (Responsible). "DEVELOPMENT OF GAS DIFFUSION ELECTRODES (EDG) FOR THE ELECTROGENERATION OF HYDROGEN PEROXIDE". Process #2001/05911-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2003), value: R$ 79.313,74. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
49
  PAULO ROBERTO MEI (Responsible). "DEVELOPMENT OF NITI ALLOYS WITH SHAPE MEMORY EFFECT FOR AEROSPACE APPLICATIONS". Process #1999/06399-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/1999-07/2002), value: R$ 235.312,61. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
50
  Nilton Cardoso da Silva (Responsible). "DEVELOPMENT OF METHODOLOGIES FOR MODELING, IMPLEMENTATION AND CONTROL ANTHROPOMORPHIC BIOMECHANIC SYSTEMS". Process #1998/15964-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/1999-03/2002), value: R$ 98.320,00.
 
51
  Julio Cesar Bastos Fernandes (Responsible). "DEVELOPMENT OF MICRO-FLUIDICS SYSTEMS FOR ASSOCIATION WITH CHEMICAL MICRO-SENSORS FOR APPLICATION IN "IN VITRO" CLINICAL ANALYSIS". Process #2001/06262-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2003), value: R$ 68.640,00.
 
52
  DOUGLAS EDUARDO ZAMPIERI (Responsible). "DEVELOPMENT OF AN AUTONOMOUS BIPEDDED ROBO INTERACTING THROUGH NEURAL NETWORKS IN DESTRUCTURED ENVIRONMENTS". Process #1999/07715-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2000-05/2002), value: R$ 57.095,00. Project linked to the DEPARTMENT OF COMPUTATIONAL MECHANICS.
 
53
  LUIZ FELIPE MENDES DE MOURA (Responsible). "DEVELOPMENT AND OPTIMIZATION OF THE CONTROL OF AN AIR CONDITIONING SYSTEM WITH HEAT STORAGE USING AN ICE BANK". Process #2001/08739-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2004), value: R$ 74.401,25. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
54
  "DETERMINATION OF COOLING RATES OF A UNIDIRECTIONAL SOLIDIFICATION SYSTEM THROUGH AN ARTIFICIAL INTELLIGENCE SEARCH TOOL". Process #2000/14499-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-04/2003), value: R$ 7.920,00.
 
55
  Auteliano Antunes dos Santos Junior (Responsible). "DETERMINATION OF RESIDUAL STRESSES IN RAILWAY WHEELS USING THE ACOUSTOELASTIC EFFECT". Process #2000/06399-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-04/2003), value: R$ 43.770,25.
 
56
  CHANG HUNG KIANG (Responsible). "Environmental Diagnosis of the Groundwater at the Bernardes Refinery - Cubatao". Petr�leo Brasileiro S/A, (11/2000-12/2002), value: R$ 55,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
57
  CHANG HUNG KIANG (Responsible). "Diagnosis of the Groundwater at the Alberto Pasqualini Refinery". Petr�leo Brasileiro S/A, (11/1999-12/2002), value: R$ 55,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
58
  CAIO GLAUCO SANCHEZ (Responsible). "DECREASE IN H2S GENERATED IN THE GASIFICATION OF BRAZILIAN MINERAL COAL IN FLUIDIZED BED". Process #1998/06757-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/1999-09/2002), value: R$ 29.020,09. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
59
  ILMAR FERREIRA SANTOS (Responsible). "NON-LINEAR DYNAMICS OF ROTORS WITH FLEXIBLE VANES CONSIDERING THE PHENOMENON OF SHOCK AND SCRAPPING AGAINST STATIONARY PARTS - THEORY AND EXPERIMENT". Process #1998/00422-0, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (07/1998-02/2002), value: R$ 95.940,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
60
  LEONARDO GOLDSTEIN JUNIOR (Responsible). "EFFECT OF SOOT CONCENTRATION ON HEAT TRANSFER BY RADIATION IN A COMBUSTION CHAMBER OPERATING WITH DIFFERENT NUMBER OF ROTATION". Process #1999/05763-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/1999-10/2002), value: R$ 51.152,50. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
61
  ROSEANA DA EXALTACAO TREVISAN (Responsible). "EFFECT OF NITROGEN CONTENT ON SUSCEPTIBILITY TO SOLIDIFICATION CRACKING IN AUSTENITIC STAINLESS STEEL WELDED BY THE FCAW PROCESS WITH ARC PULSATION". Process #2000/01279-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-11/2002), value: R$ 25.900,29. Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
62
  Yolanda Vieira de Abreu (Responsible). "ENERGY EFFICIENCY AND ECONOMIC GROWTH: A COMPARATIVE STUDY". Process #1999/04170-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1999-06/2003), value: R$ 105.144,00.
 
63
  EUGENIO SPANO ROSA (Responsible). "Artificial Lifting of Heavy Oils". Financing of Studies and Projects, (03/2000-03/2002), value: US$ 21.876,80; Petr�leo Brasileiro S/A, (04/2000-05/2001), value: US$ 6.752,95. Project linked to the ENERGY DEPARTMENT.
 
64
  ANTONIO CARLOS BANNWART (Responsible). "Lifting and transporting heavy oils through core-flow". Financing of Studies and Projects, (03/2000-03/2002), value: US$ 14.392,63; Petr�leo Brasileiro S/A, (04/2000-03/2001), value: US$ 5.627,46. Project linked to the ENERGY DEPARTMENT.
 
65
  Edna Rodrigues Cassemiro (Responsible). "DEVELOPMENT OF METHODOLOGIES FOR DEVELOPMENT OF BIOMECHANICAL DEVICES FOR APPLICATION IN ANTHROPOMORPHIC PROSTHESIS". Process #2000/01838-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-02/2002), value: R$ 27.080,00.
 
66
  MARCIO LUIZ DE SOUZA SANTOS (Responsible). "USE OF THE FLOW METHOD FOR IMPROVEMENTS IN RADIATION HEAT EXCHANGE MODELING IN BOILERS AND BUBBLING FLUIDIZED BED GASEFICATORS". Process #1998/02891-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/1998-07/2002), value: R$ 88.812,65. Project linked to the ENERGY DEPARTMENT.
 
67
  Eduardo Antonio Goulart (Responsible). "ENERGY AND ENVIRONMENT: OBTAINING ENERGY ENERGY FROM THE THERMOCONVENTION OF USED TIRES". Process #1999/02211-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/1999-04/2003), value: R$ 105.144,00.
 
68
  DENIS JOSE SCHIOZER (Responsible). "Viscous Flow". Petr�leo Brasileiro S/A, (08/2002-11/2004), value: US$ 1.080.458,20. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
69
  FERNANDO DE ALMEIDA FRANCA (Responsible). "Studies on Thermofluidynomics of Production Processes". Financing of Studies and Projects, (10/2001-10/2003), value: US$ 54.473,50; Petr�leo Brasileiro S/A, (10/2001-12/2003), value: US$ 81.063,55. Project linked to the ENERGY DEPARTMENT.
 
70
  Pythagoras Grangeiro Furtado (Responsible). "FRAMEWORK FOR SUPPLY CHAIN ​​MANAGEMENT". Process #1999/12220-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2004), value: R$ 105.144,00.
 
71
  ELIANA APARECIDA DE REZENDE DUEK (Responsible). "STUDY OF THE DEGRADATION OF POLY(LACTIC ACID)/POLY(LACTIC ACID)-CO-(GLYCOLIC ACID) BLENDS FOR APPLICATION AS PLATES FOR NEUROSURGERY". Process #1999/01381-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/1999-04/2002), value: R$ 12.037,50. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
72
  RODNEI BERTAZZOLI (Responsible). "STUDY OF THE DEGRADATION OF GARBAGE LEASE FROM A SANITARY LANDFILL THROUGH PHOTO-ASSISTED ELECTROLYSIS". Process #2000/11218-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2001-12/2002), value: R$ 102.766,10. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
73
  RODNEI BERTAZZOLI (Responsible). "STUDY OF THE DEGRADATION OF GARBAGE LEASE FROM A SANITARY LANDFILL THROUGH PHOTO-ASSISTED ELECTROLYSIS". Process #2001/06875-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-03/2002), value: R$ 3.616,69.
 
74
  LEONARDO GOLDSTEIN JUNIOR (Responsible). "STUDY OF PHASE DISTRIBUTION AND PRESSURE DROP OF HORIZONTAL AIR-WATER PISTONED FLOW IN T-JUNCTIONS". Process #2000/11948-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (02/2001-03/2003), value: R$ 65.097,81. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
75
  Raul Fernando Cuevas Rojas (Responsible). "STUDY OF THE FORMATION OF DEFECTS RELATED TO SECOND ORDER NON-LINEARITY IN GLASS PREFORMS OF "SIO2:GE02" MANUFACTURED BY THE VAPOR PHASE DEPOSITION TECHNIQUE - VAD". Process #2000/15035-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2003), value: R$ 68.640,00.
 
76
  Renata Taukeuti Pinto (Responsible). "STUDY OF THE INFLUENCE OF THE SUBSTRATE ON THE ELECTROCHEMICAL GOLD RECOVERY PROCESS IN EFFLUENTS FROM THE SEMI-JEWELRY INDUSTRY". Process #2001/11131-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2001-09/2002), value: R$ 3.300,00.
 
77
  ROSEANA DA EXALTACAO TREVISAN (Responsible). "STUDY OF THE SUSCEPTIBILITY TO CRACKING OF DIFFERENT TUBULAR ELECTRODES IN STAINLESS STEEL WELDING". Process #2002/04568-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2003), value: R$ 24.362,50. Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
78
  Francisco de Carvalho Santos (Responsible). "STUDY OF SURFACE FAULTS GENERATED IN THE WHEEL-RAIL CONTACT AND THEIR INFLUENCE ON THE SERVICE LIFE OF RAILWAY WHEELS". Process #2000/02878-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2004), value: R$ 105.144,00.
 
79
  L�zaro Valentim Donadon (Responsible). "STUDY OF VIBRATION AND SOUND RADIATION PHENOMENA IN REINFORCED PANELS APPLIED TO VIBRATION AND NOISE CONTROL". Process #2002/05664-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2002-08/2003), value: R$ 34.320,00.
 
80
  MARCIO LUIZ DE SOUZA SANTOS (Responsible). "STUDY OF TRANSIENT PHENOMENA IN FLUIDIZED BEDS". Process #1998/00856-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/1998-07/2002), value: R$ 93.475,00. Project linked to the ENERGY DEPARTMENT.
 
81
  SERGIO TONINI BUTTON (Responsible). "STUDY OF ALTERNATIVE LUBRICANTS FOR COLD EXTRUSATION OF STEEL PARTS". Process #2002/03002-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2003), value: R$ 6.173,75. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
82
  "STUDY OF HEXAVALENT CHROME-FREE PASSIVATION PROCESSES FOR ELECTRODEPOSITED ZINC LAYERS AND ZINC ALLOYS". Process #1999/07926-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2000-06/2002), value: R$ 82.615,24.
 
83
  MILTON DIAS JUNIOR (Responsible). "STUDY OF TECHNIQUES FOR OBTAINING AND ANALYSIS OF OPERATING MODES OF STATIONARY AND NON-STATIONARY SYSTEMS". Process #2002/00049-5, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (04/2002-03/2003), value: R$ 3.960,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
84
  Rone C�sar Morales (Responsible). "STUDY OF THE CYCLE FOR OBTAINING SILICON AND SILICON CARBIDE USING COAL FROM SUGAR CANE BAGAC IN A PLASMA REACTOR". Process #2000/01602-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-03/2004), value: R$ 105.144,00.
 
85
  WALDIR ANTONIO BIZZO (Responsible). "STUDY OF THE PERFORMANCE OF A WET CYCLONE AS A FLUE GAS DESULFURIZER". Process #1999/06561-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1999-08/2002), value: R$ 17.183,30. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
86
  MARIA HELENA ROBERT (Responsible). "STUDY OF THE FORMING PROCESS, BY STAMPING, OF ALUMINUM ALLOYS IN THE RE-MELTED STATE". Process #2001/09734-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2004), value: R$ 24.781,25. Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
87
  H�lio Carlos Bortolon (Responsible). "NUMERICAL AND EXPERIMENTAL STUDY ON HORIZONTAL ICE BANK WITH RADIALLY FINNED TUBES". Process #1999/02332-1, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1999-06/2003), value: R$ 105.144,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
88
  "STUDY TO DETERMINE THE COST OF THE INTEGRATED LOGISTICS CHAIN ​​OF VIRTUAL COMPANIES". Process #2000/09704-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-06/2002), value: R$ 19.870,00.
 
89
  Vanessa Petrilli Bavaresco (Responsible). "TRIBOLOGICAL STUDY OF POLYMER HYDROGELS TO BE USED AS ARTIFICIAL JOINT CARTILAGE". Process #2000/06839-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2000-07/2004), value: R$ 105.144,00.
 
90
  ANTONIO CARLOS BANNWART (Responsible). "INTERFACE SHAPE AND PRESSURE GRADIENT IN THE VERTICAL ASCENDING "CORE-ANNULAR" PATTERN". Process #1998/10520-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/1998-06/2002), value: R$ 97.033,61. Project linked to the ENERGY DEPARTMENT.
 
91
  "FORMATION OF MANUFACTURING CELLS CONSIDERING PRODUCTION CAPACITY". Process #2000/04989-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2005), value: R$ 105.144,00.
 
92
  Carlos Henrique Daros (Responsible). "GREEN FUNCTIONS AND THE BOUNDARY ELEMENT METHOD APPLIED TO WAVE PROPAGATION IN NON-HOMOGENEOUS ELASTIC MEDIUMS". Process #2001/09822-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-04/2002), value: R$ 11.440,00.
 
93
  FERNANDO DE ALMEIDA FRANCA (Responsible). "Flow Assurance II - Activities in Hydrates and Paraffins". Financing of Studies and Projects, (03/2000-03/2002), value: US$ 64.478,99; Petr�leo Brasileiro S/A, (04/2000-10/2001), value: US$ 28.137,31. Project linked to the ENERGY DEPARTMENT.
 
94
  JOAO MAURICIO ROSARIO (Responsible). "Implementation of PLC Programming Didactic Kits at FEM-UNICAMP". LIISI - Lab Ing. Integree des Systemes de Industrielles, (07/2000-), value: R$ 30.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
95
  JOAO MAURICIO ROSARIO (Responsible). "Implementation of an Industrial Robotics Training Center at FEM-UNICAMP". ABB Ltda., (06/2000-), value: R$ 200.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
96
  JOAO MAURICIO ROSARIO (Responsible). "Implementation of a Training Center in Industrial Supervision and Control System at FEM/UNICAMP". General Electric Company, (04/2000-), value: R$ 30.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
97
  "IMPLEMENTATION OF AN INTEGRATED SYSTEM FOR PRODUCT SEPARATION IN AN AUTOMATED PRODUCTION LINE BASED ON COLOR RECOGNITION". Process #2000/13835-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-02/2002), value: R$ 3.960,00.
 
98
  ITAMAR FERREIRA (Responsible). "Influence of the microstructure on the mechanical properties and corrosion resistance in an artificial physiological environment of an austenitic stainless steel with a high nitrogen content ISO 5832-9, used in the manufacture of orthopedic implants". Fapesp, (07/2000-06/2002), value: R$ 40.000,00. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
99
  ITAMAR FERREIRA (Responsible). "INFLUENCE OF MICROSTRUCTURE ON MECHANICAL PROPERTIES AND CORROSION RESISTANCE IN ARTIFICIAL PHYSIOLOGICAL MEDIUM OF A HIGH NITROGEN AUSTENITIC STAINLESS STEEL ISO 5832-9, USED IN...". Process #2000/02803-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2000-06/2002), value: R$ 40.524,70. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
100
  Jos� Carlos dos Santos Pires (Responsible). "INTERACTION BETWEEN THERMODYNAMIC ANALYSIS AND A KNOWLEDGE BASE AND ITS CORRELATION WITH THE PROFILE OF INCLUSIONS IN CONTINUOUS STEEL CASTING". Process #1999/12394-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2000-02/2004), value: R$ 100.542,00.
 
101
  Carla Kazue Nakao Cavaliero (Responsible). "INTRODUCTION OF INCENTIVE PROGRAMS FOR THE USE OF RENEWABLE SOURCES AND ALTERNATIVE ENERGY IN THE NEW BRAZILIAN ENERGY SCENARIO: CASE STUDY IN THE AMAZON REGION". Process #1999/04115-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1999-06/2003), value: R$ 105.144,00.
 
102
  RAUL ANTONINO FEIJO� (Responsible). "Theoretical, applied and computational solid mechanics and its applications in the simulation of complex problems". Process #523117/96-5, National Council for Scientific and Technological Development, (03/2001-), value: US$50.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
103
  JOAO MAURICIO ROSARIO (Responsible). "Infrastructure Improvement of the FEM Computational Teaching Laboratory". State University of Campinas, (11/2002-12/2002), value: R$ 30.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
104
  DENIS JOSE SCHIOZER (Responsible). "Methodology for Analysis of Oil Field Assessment Plans". National Petroleum Agency, (01/2002-12/2003), value: R$ 468,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
105
  ARNALDO CESAR DA SILVA WALTER (Responsible). "Evaluation methodologies and instruments for enabling the potential for producing electrical energy with sugarcane waste". Process #FUNCAMP 2556, Companhia Paulista de For�ae Luz, (12/2002-07/2003), value: R$ 303.256,00. Project linked to the ENERGY DEPARTMENT.
 
106
  Cristina Cledia Mezzomo (Responsible). "PRODUCTION STRATEGY OPTIMIZATION METHODOLOGY USING RESERVOIR SIMULATION". Process #2000/12725-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-01/2003), value: R$ 46.911,00.
 
107
  MARCO LUCIO BITTENCOURT (Responsible). "MULTIGRID METHODS IN LINEAR AND NON-LINEAR PROBLEMS". Process #1998/03101-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/1998-06/2002), value: R$ 100.505,93.
 
108
  CELSO KAZUYUKI MOROOKA (Responsible). "Almost 3D Method of TTR Production Rigid Riser Dynamics in Fatigue Assessment". Financing of Studies and Projects, (12/2001-12/2003), value: US$47.171,78; Petr�leo Brasileiro S/A, (12/2001-01/2003), value: US$ 51.246,30. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
109
  RUBENS CARAM JUNIOR (Responsible). "SOLIDIFICATION MICROSTRUCTURE AND PROPERTIES OF EUTETIC ALLOYS IN NI-AL-MR SYSTEMS (MR=MO, TA, W, NB)". Process #1998/10527-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1998-08/2002), value: R$ 104.779,28. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
110
  RUBENS CARAM JUNIOR (Responsible). "SOLIDIFICATION MICROSTRUCTURE AND PROPERTIES OF EUTETIC ALLOYS IN NI-AL-MR SYSTEMS (MR=MO; TA; W;NB)". Process #1999/11118-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-05/2002), value: R$ 169.506,08. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
111
  KAMAL ABDEL RADI ISMAIL (Responsible). "Numerical Modeling and Experimental Verification of Some Ice Shelf Models". National Council for Scientific and Technological Development, (08/2001-07/2003), value: R$ 140.000,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
112
  AMAURI GARCIA (Responsible). "MODELING AND SIMULATION OF SOLIDIFICATION PROCESSES". Process #2001/01342-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2001-09/2005), value: R$ 358.503,60. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
113
  Takeo Jonas Fudihara (Responsible). "MODELING AND SIMULATION OF FLOW IN A VARIABLE ROTATION NUMBER BURNER IN A HORIZONTAL CYLINDRICAL CHAMBER". Process #2000/14390-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (07/2001-06/2003), value: R$ 68.640,00.
 
114
  Carlos Alexandre dos Santos (Responsible). "MATHEMATICAL MODELING OF SOLIDIFICATION AND APPLICATION OF INTELLIGENT CONTROL STRATEGIES IN THE COOLING STEPS OF CONTINUOUS STEEL CASTING". Process #2000/14314-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2001-04/2003), value: R$ 68.640,00.
 
115
  "ASSEMBLY AND ANALYSIS OF THE TECHNICAL-ECONOMIC PERFORMANCE OF A WIND GENERATOR". Process #2000/02575-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2002), value: R$ 7.920,00.
 
116
  SERGIO GAMA (Responsible). "OBTAINING AMORPHOUS COLUMEN AND NANOCRYSTALLINE ALLOYS: APPLICATIONS TO ALUMINUM ALLOYS AND MAGNETOCALORIC INTERMETALLIC COMPOUNDS". Process #2001/14374-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2005), value: R$ 77.532,00.
 
117
  Celia Regina Tomachuk dos Santos (Responsible). "OBTAINING ZINC ALLOY COATINGS THROUGH PULSED AND CONTINUOUS CURRENT ELECTRODEPOSITION - ALTERNATIVES FOR THE CHROMATING PROCESS, WITH LOW ENVIRONMENTAL IMPACT, AND..". Process #2000/12693-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (05/2002-04/2003), value: R$ 8.580,00.
 
118
  CARLOS KENICHI SUZUKI (Responsible). "OBTAINING SILICON METALLIC BY PLASMA AND THE STUDY OF THE CYCLE OF MATERIALS INVOLVED". Process #1999/04181-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/1999-06/2002), value: R$ 99.603,29. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
119
  Srdjan Milenkovic (Responsible). "OBTAINMENT AND CHARACTERIZATION OF INTERMETALLIC COMPOUND TYPE B2 IN THE TI-AL-CR SYSTEM". Process #2002/06865-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2002-10/2003), value: R$ 34.320,00.
 
120
  Gisela Martinelli Rocha Mello (Responsible). "OBTAINING AND CHARACTERIZING BETA TYPE TITANIUM ALLOYS FOR SORTOPEDICAL IMPLANTS". Process #2000/00786-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2000-02/2004), value: R$ 89.037,00.
 
121
  RUBENS CARAM JUNIOR (Responsible). "OBTAINMENT AND CHARACTERIZATION OF COMPOSITE MATERIALS OBTAINED FROM NI-SLI ALLOYS". Process #1999/10805-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-05/2002), value: R$ 109.412,65. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
122
  ITAMAR FERREIRA (Responsible). "OBTAINMENT, AND MICROSTRUCTURAL CHARACTERIZATION AND PROPERTIES OF THE TI-35NB-5TA-7ZR ALLOY FOR IMPLANTS". Process #1999/09013-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-06/2002), value: R$ 5.875,00. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
123
  "OBTAINMENT, DIRECTIONAL SOLIDIFICATION AND CHARACTERIZATION OF THE NI-AL-NB EUTETIC ALLOY". Process #2000/07993-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-03/2002), value: R$ 23.990,00.
 
124
  DENIS JOSE SCHIOZER (Responsible). "Production Strategy Optimization Through Numerical Simulation of Reservoirs". Petr�leo Brasileiro S/A, (01/2000-10/2002), value: R$ 178.000,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
125
  LEONARDO GOLDSTEIN JUNIOR (Responsible). "Optimization of the Cyclone-Rigid Filter Combination for Gas Cleaning at High Temperature". Process #00, Petr�leo Brasileiro S/A, (05/1999-03/2003), value: US$ 34.000,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
126
  SERGIO NASCIMENTO BORDALO (Responsible). "Optimization of Lifting Methods". Financing of Studies and Projects, (10/2001-10/2003), value: US$70.126,23; Petr�leo Brasileiro S/A, (12/2001-12/2003), value: US$ 81.845,70. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
127
  ANSELMO EDUARDO DINIZ (Responsible). "OPTIMIZATION OF MACHINING WITHOUT CUTTING FLUID IN STEEL TURNING IN ROUGHING AND FINISHING OPERATIONS". Process #2001/09582-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2002-03/2004), value: R$ 203.970,00. Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
128
  LUIZ FERNANDO MILANEZ (Responsible). "OTIMIZATION OF THE COMBUSTION PROCESS IN AUTOMOTIVE DIESEL CYCLE ENGINES OPERATING WITH ALTERNATIVE FUELS". Process #2001/08480-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-07/2003), value: R$ 18.469,00. Project linked to the ENERGY DEPARTMENT.
 
129
  "STRUCTURAL OPTIMIZATION IN FATIGUE PROBLEMS". Process #2000/00595-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2000-02/2002), value: R$ 30.168,73.
 
130
  Luciano Santos Driemeier (Responsible). "TOPOLOGICAL OPTIMIZATION IN LINEAR AND NON-LINEAR ELASTICITY PROBLEMS". Process #2000/03260-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-02/2002), value: R$ 28.109,96.
 
131
  RODNEI BERTAZZOLI (Responsible). "ELECTROLYTIC OXIDATION OF ORGANIC COMPOUNDS IN FLOW CELLS: APPLICATION TO PHENOL SOLUTIONS". Process #1998/10920-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/1998-04/2002), value: R$ 95.940,00. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
132
  EUGENIO SPANO ROSA (Responsible). "Light and Heavy Oil". Petr�leo Brasileiro S/A, (12/2002-06/2003), value: US$ 11.451,09. Project linked to the ENERGY DEPARTMENT.
 
133
  GILBERTO DE MARTINO JANNUZZI (Responsible). "ENERGY EFFICIENCY AND QUALITY STANDARDS: INSTRUMENTS FOR PUBLIC POLICY ON TECHNOLOGICAL INNOVATION AND ENERGY EFFICIENCY". Process #2002/05250-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2002-09/2004), value: R$ 19.256,25. Project linked to the ENERGY DEPARTMENT.
 
134
  Marcio Yamamoto (Responsible). "DYNAMIC POSITIONING OF FLOATING OIL PLATFORMS USING ARTIFICIAL INTELLIGENCE TECHNIQUES". Process #2001/07787-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2001-08/2002), value: R$ 3.960,00.
 
135
  SAUL BARISNIK SUSLICK (Responsible). "Provision of Specialized Technical Consultancy Services with a view to establishing a Network Training Program for Regulators". National Petroleum Agency, (12/2001-05/2002), value: US$ 38.893,10. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
136
  ANTONIO CARLOS BANNWART (Responsible). "Multiphase Production and Transport of Heavy Oils". Financing of Studies and Projects, (12/2001-12/2003), value: US$127.478,90; Petr�leo Brasileiro S/A, (12/2001-12/2003), value: US$ 141.861,22. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
137
  FERNANDO DE ALMEIDA FRANCA (Responsible). "Professor Member of the Center of Excellence - PRONEX (CAPES)". Financing of Studies and Projects, (11/2000-12/2003), value: R$ 900.000,00; National Research Council-CNPq, (11/2000-12/2003), value: R$ 900.000,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
138
  ANTONIO CELSO FONSECA DE ARRUDA (Responsible). "Professor Member of the REENGE Project (CNPq)". National Council for Scientific and Technological Development, (11/1999-12/2002), value: R$ 55,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
139
  DENIS JOSE SCHIOZER (Responsible). "Program for calculating equivalent properties in single- and two-phase systems". Financing of Studies and Projects, (03/2000-03/2002), value: US$63.327,58; Petr�leo Brasileiro S/A, (04/2000-04/2001), value: US$ 25.886,33. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
140
  ANTONIO BATOCCHIO (Responsible). "Project for the application of value analysis techniques". Eldorado Research Institute, (04/2001-06/2006), value: US$ 120.000,00. Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
141
  JOAO MAURICIO ROSARIO (Responsible). "Design and Development of a Hydraulically Driven Platform Controlled by Computer with several degrees of freedom capable of reproducing the Spectrum of Sea Movements to be used in Primary Fluid Processing". Petr�leo Brasileiro S/A, (02/2002-), value: R$ 116.100,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
142
  RUBENS CARAM JUNIOR (Responsible). "PREPARATION AND CHARACTERIZATION OF IN SITU COMPOSITE MATERIALS FROM EUTETIC ALLOYS IN THE NI-AL-V SYSTEM". Process #1998/06660-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/1998-07/2002), value: R$ 105.144,00. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
143
  "SIGNAL PROCESSING IN THE IDENTIFICATION AND TESTING OF MECHANICAL STRUCTURES". Process #2000/03005-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2000-05/2004), value: R$ 105.144,00.
 
144
  GABRIEL FERRAZ GOSTAUTAS (Responsible). "THERMAL PROCESS FOR REGENERATION OF FOUNDRY SAND IN FLUIDIZED MILK". Process #2001/01365-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (04/2001-03/2002), value: R$ 6.000,00.
 
145
  ARAI AUGUSTA BERNARDEZ PECORA (Responsible). "THERMAL PROCESS FOR REGENERATION OF FOUNDRY SAND IN FLUIDIZED BED". Process #2000/06204-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-02/2003), value: R$ 20.567,85. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
146
  Luis Fernando Gobbi de Andrade Marques (Responsible). "MODELING PROJECT AND IMPLEMENTATION OF ANTHROPOMORPHIC KNEE JOINT PROSTHESIS". Process #2001/02866-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2001-05/2002), value: R$ 3.960,00.
 
147
  SERGIO TONINI BUTTON (Responsible). "DESIGN AND CONSTRUCTION OF EQUIPMENT FOR CROSS-WEDGE ROLLING OF STEPPED SHAFTS AND FOR TUBE DRAWING. ''". Process #2000/05155-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-01/2003), value: R$ 40.123,83. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
148
  "PROJECT I IMPLEMENTATION OF A DRIVE AND CONTROL SYSTEM APPLIED TO A BIOMECHANICAL PROSTHESIS FOR SEIZURE". Process #2000/09956-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2001-08/2002), value: R$ 5.940,00.
 
149
  LUIZ OTAVIO SARAIVA FERREIRA (Responsible). "DESIGN, MICROFABRICATION AND CHARACTERIZATION OF MICROELETROMECHANIC OSCILLATORS WITH ELECTROMAGNETIC DRIVE". Process #2000/10487-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2001-12/2003), value: R$ 230.148,12.
 
150
  SERGIO TONINI BUTTON (Responsible). "RAPID PROTOTYPING OF TOOLS FOR SHEET METAL FORMING". Process #2001/10025-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-05/2004), value: R$ 5.000,00. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
151
  DENIS JOSE SCHIOZER (Responsible). "Quantification of Uncertainties and Risk Analysis in Oil Exploration and Production Projects". Petr�leo Brasileiro S/A, (01/2001-01/2002), value: US$ 60.821,08. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
152
  RODNEI BERTAZZOLI (Responsible). "ELECTROCHEMICAL RECOVERY OF GOLD IN EFLENTS FROM THE SEMI-JEWELRY INDUSTRY". Process #2001/11132-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2002-12/2003), value: R$ 113.424,26. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
153
  CECILIA AMELIA DE CARVALHO ZAVAGLIA (Responsible). "REPAIR OF A SCANNING ELECTRON MICROSCOPE". Process #2002/04297-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/2002-08/2002), value: R$ 10.038,00. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
154
  LEONARDO GOLDSTEIN JUNIOR (Responsible). "SCALE UP OF CYCLONES". Process #1999/03552-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (06/1999-06/2002), value: R$ 28.700,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
155
  JORGE STOLFI (Responsible). "Simulation of Multiphase Flow in Porous Media with Dynamically Adaptive Resolution Meshes". Coordination of the Improvement of Higher Education Personnel, (11/2001-), value: R$ 90.000,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
156
  DENIS JOSE SCHIOZER (Responsible). "Simulation of Reservoirs with Parallel Processing". Financier of Studies and Projects, (01/2001-12/2003), value: R$ 55,00. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
157
  EUGENIO SPANO ROSA (Responsible). "Numerical simulation of transfer processes in offshore operations". Financing of Studies and Projects, (11/2000-11/2002), value: US$46.638,87. Project linked to the ENERGY DEPARTMENT.
 
158
  PAULO ROBERTO RIBEIRO (Responsible). "Kick Simulators". Financing of Studies and Projects, (11/2000-11/2002), value: US$93.798,85; Petr�leo Brasileiro S/A, (01/2001-01/2003), value: US$ 39.527,72. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
159
  DENIS JOSE SCHIOZER (Responsible). "Automated System". Petr�leo Brasileiro S/A, (08/2000-08/2002), value: US$ 97.641,25. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
160
  LEONARDO GOLDSTEIN JUNIOR (Responsible). "Multiphysical Systems: Phenomenology and Application in Combustion and Reduction of Pollutant Emissions". National Fund for Scientific and Technological Development - FINEP, (01/1999-12/2003), value: US$ 1,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
161
  PAULO ROBERTO MEI (Responsible). "SIMULATING THE CASTING OF THIN STEEL PLATES AND INVESTIGATION OF THE HARDENING MECHANISMS OF V-NB MICROALLOYED STEEL". Process #2000/11505-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (01/2001-06/2003), value: R$ 83.225,98. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
162
  No Cheung (Responsible). "NUMERICAL SIMULATION OF SURFACE TREATMENT BY LASER REMELTING: LASER-MATTER INTERACTION AND SOLIDIFICATION". Process #1998/15207-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/1999-02/2003), value: R$ 105.144,00.
 
163
  "NUMERICAL SIMULATION AND ANALYSIS, WITH EXPERIMENTAL VALIDATION OF A SOLID ADSORPTION REFRIGERATION SYSTEM". Process #2000/07655-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2000-04/2002), value: R$ 51.801,00.
 
164
  JOSE RICARDO FIGUEIREDO (Responsible). "NUMERICAL SIMULATION AND ANALYSIS, WITH EXPERIMENTAL VALIDATION OF A SOLID ADSORPTION REFRIGERATION SYSTEM". Process #2000/14315-3, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/2001-07/2003), value: R$ 92.485,66. Project linked to the ENERGY DEPARTMENT.
 
165
  Adriana Cristina Motta de M. Monteiro (Responsible). "IN VITRO SYNTHESIS, CHARACTERIZATION AND DEGRADATION OF POLY(LACTIC ACID) AND POLY(LACTIC ACID-CO-GLYCOLIC ACID)". Process #2000/08359-8, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-08/2002), value: R$ 28.728,00.
 
166
  Gustavo Nucci Franco (Responsible). "HOLONIC MANUFACTURING SYSTEMS: AN APPROACH IN RELATION TO THE BRAZILIAN REALITY". Process #1998/10840-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/1998-11/2002), value: R$ 105.144,00.
 
167
  ANTONIO BATOCCHIO (Responsible). "Manufacturing Automation Subnet - RECOPE". Process #77.97.0693.00, Studies and Projects Financier, (03/1998-), value: US$ 70.000,00. Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
168
  LEONARDO GOLDSTEIN JUNIOR (Responsible). "Shale Fines Burning Tests". Petr�leo Brasileiro S/A, (04/2001-12/2002), value: R$ 100.000,00. Project linked to the DEPARTMENT OF THERMAL ENGINEERING AND FLUIDS.
 
169
  Carmo Roberto Pelliciari de Lima (Responsible). "MICROSTRUCTURAL CHARACTERIZATION TECHNIQUES USED IN THE DEVELOPMENT OF TITANIUM ALLOYS USED IN ORTHOPEDIC PROSTHESES". Process #2001/07255-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2002-02/2003), value: R$ 34.320,00.
 
170
  ITAMAR FERREIRA (Responsible). "FRACTURE TENACITY IN HAZ OF 2,25CR-IMO STEEL SUBJECT TO BRITTLEMENT BY TEMPERING". Process #2001/07961-9, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2001-06/2003), value: R$ 35.437,50. Project linked to the MATERIALS ENGINEERING DEPARTMENT.
 
171
  "THEORY OF NON-LINEAR VIBRATIONS OF NON-IDEAL SIMPLE PORT TYPE DYNAMIC SYSTEMS". Process #1998/02759-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (08/1998-07/2002), value: R$ 94.386,50.
 
172
  DENIS JOSE SCHIOZER (Responsible). "Advanced Numerical Reservoir Simulation Techniques". Financing of Studies and Projects, (10/2001-10/2003), value: US$59.513,38; Petr�leo Brasileiro S/A, (10/2001-10/2003), value: US$ 128.252,11. Project linked to the PETROLEUM ENGINEERING DEPARTMENT.
 
173
  ANSELMO EDUARDO DINIZ (Responsible). "DRY AND CUTTING FLUID STEEL TURNING: TOOL GEOMETRY, FLUID APPLICATION METHODS AND FEASIBILITY OF USE IN THIN-WALLED PARTS". Process #2002/07543-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (11/2002-10/2005), value: R$ 77.532,00. Project linked to the MANUFACTURING ENGINEERING DEPARTMENT.
 
174
  Cláudio Alves de Siqueira Filho (Responsible). "COLUMAR/EQUIAXIAL TRANSITION IN UNIDIRECTIONAL SOLIDIFICATION: VERTICAL ASCENDANT AND HORIZONTAL". Process #2002/08138-7, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2002-11/2003), value: R$ 34.320,00.
 
175
  "TREATMENT OF LEASE FROM A SANITARY LANDFILL THROUGH ELECTROLYSIS ASSISTED BY PHOTOCATALYSIS". Process #2000/10453-2, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/2000-11/2004), value: R$ 105.144,00.
 
176
  Mara Terumi Fukunaga (Responsible). "TREATMENT OF EFFLUENTS DERIVED FROM THE PHENOL PRODUCING INDUSTRY THROUGH ELECTROLYSIS-ASSISTED PHOTOCATALYSIS". Process #1999/09468-6, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (12/1999-04/2003), value: R$ 89.037,00.
 
177
  FRANCO GIUSEPPE DEDINI (Responsible). "A CONTRIBUTION TO DESIGN METHODOLOGY FOR THE DEVELOPMENT OF CHILDREN'S GAMES AND TOYS". Process #2002/05714-7, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (09/2002-08/2004), value: R$ 26.400,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
178
  Karen by Lolo Guilherme (Responsible). "A CONTRIBUTION TO THE STUDY OF A VIBRATORY SYSTEM, WITH TWO DEGREES OF FREEDOM, EXCITED BY A LIMITED POWER SOURCE, VIA NUMERICAL SIMULATIONS". Process #2001/12222-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2002-03/2004), value: R$ 19.602,00.
 
179
  Rog�rio Sim�es (Responsible). "A FORMULATION FOR THE ANALYSIS OF THIN SECTION PARTS WITH THE EFFECT OF GEOMETRIC NON-LINEARITY UNDER THE TRANSIENT DYNAMIC EFFECT USING THE BOUNDARY ELEMENT METHOD". Process #2001/07774-4, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (10/2001-09/2004), value: R$ 77.532,00.
 
180
  Carlos Eduardo Foltran (Responsible). "A FORMULATION FOR ANALYSIS OF THIN SECTION PARTS IN ELASTOPLASTIC REGIME UNDER TRANSIENT DYNAMIC EFFECT USING THE BOUNDARY ELEMENT METHOD". Process #1999/10192-5, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (03/2000-02/2004), value: R$ 49.920,00.
 
181
  JOAO MAURICIO ROSARIO (Responsible). "Use of Brake Test Bench in the Control and Automation Engineering Course". Robert Bosch do Brasil Ltda, (07/2001-), value: R$ 30.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
182
  JOAO MAURICIO ROSARIO (Responsible). "Use of the ALTERA Development System (programmable logic circuits)
in the Undergraduate, Postgraduate and Extension Courses at FEM-UNICAMP".
PI Componentes, (07/1998-), value: R$ 30.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.

 
183
  JOAO MAURICIO ROSARIO (Responsible). "Use of the PCIM-AFNOR Industrial Supervision System with Telemecanique PLCs". General Electric Company, (07/1998-), value: R$ 30.000,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.
 
184
  SILVIA AZUCENA NEBRA DE PEREZ (Responsible). "USE OF BIOMASS FOR FUEL PURPOSES: CASE STUDY - SUGARCANE BAGAC". Process #2000/03087-0, Fundação de Amparo – Pesquisa do Estado de S�o Paulo, (09/2000-03/2003), value: R$ 64.873,67. Project linked to the ENERGY DEPARTMENT.
 
185
  ILMAR FERREIRA SANTOS (Responsible). "USE OF ACTIVE SEGMENTED BEARINGS FOR STABILIZATION OF ROTATING SYSTEMS INTERACTING WITH FLUIDS". Process #1999/00755-2, Fundação de Amparo - Pesquisa do Estado de S�o Paulo, (06/1999-05/2003), value: R$ 105.144,00. Project linked to the MECHANICAL DESIGN DEPARTMENT.